Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method

被引:50
|
作者
Liu, Xinrong [1 ,2 ]
Liu, Yongquan [1 ,2 ]
Yang, Zhongping [1 ,2 ]
He, Chunmei [1 ,2 ]
机构
[1] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
[2] Chongqing Univ, Minist Educ, Key Lab New Technol Construct Cities Mt Area, Chongqing 400045, Peoples R China
基金
中国国家自然科学基金;
关键词
subway station construction; Pile-Beam-Arch method; numerical simulation; mechanical performance; ground surface settlement; METRO STATION; TUNNELS;
D O I
10.1007/s12205-016-0004-9
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Pile-Beam-Arch (PBA) method is an effective approach to control the surface settlement induced by excavation to construct the subway station, especially when the station is located in the urban area with dense buildings. Based on the numerical analysis model of practical engineering, the whole construction stages of the subway station built by PBA method are simulated in this paper. The mechanical performance of supporting structures (such as piles, beams, arches, secondary lining and backfill concrete) and surface settlement characteristics during construction are investigated. The results show that the pre-supporting system of piles, beams and arches is formed in the stage of soil excavation under main tunnel arch; Station hall plate and backfill concrete are two key structures to ensure the support stiffness of PBA supporting system. In addition, compared to the bottom-up method, the top-down method for the secondary lining construction can obviously reduce the internal force of supporting structures and the surface settlement. Combined with in-situ monitoring data, three increase stages of surface settlement and the corresponding settlement ratio are gained and the characteristic of surface settlement trough is also analysed. This study is helpful for further understanding the support mechanism of PBA method and the increase law of the ground settlement during the construction of the station built by PBA method.
引用
收藏
页码:1690 / 1705
页数:16
相关论文
共 22 条
  • [1] Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method
    Xinrong Liu
    Yongquan Liu
    Zhongping Yang
    Chunmei He
    KSCE Journal of Civil Engineering, 2017, 21 : 1690 - 1705
  • [2] Ground surface settlement response to subway station construction activities using pile-beam-arch method
    Guo, Xiangyu
    Wang, Zhengzheng
    Geng, Ping
    Chen, Changjian
    Zhang, Jing
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 108
  • [3] Surface settlement of subway station construction using pile-beam-arch approach
    Yu, Lin
    Zhang, Dingli
    Fang, Qian
    Cao, Liqiang
    Xu, Tong
    Li, Qianqian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 340 - 356
  • [4] Analysis of stratum deformation and pile foundation response during subway station built by pile-beam-arch construction method
    School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China
    不详
    Beijing Jiaotong Daxue Xuebao, 2008, 3 (30-36): : 30 - 36
  • [5] Research on Surface Settlement of Subway Station Construction Using Pile-Beam-Arch Approach
    Xu, Yushan
    Tang, Bo
    Duan, Yanwei
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [6] Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method
    Ding, Deyun
    Yang, Xiuren
    Lu, Weidong
    Liu, Weining
    Yan, Mei
    Li, Aimin
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2711 - +
  • [7] Internal force calculation and supporting parameters sensitivity analysis of side piles in the subway station excavated by Pile-Beam-Arch method
    Liu, Xinrong
    Liu, Yongquan
    Qu, Wanbo
    Tu, Yiliang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 56 : 186 - 201
  • [8] Numerical study study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method
    Li, B.
    Wang, Z. Z.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 88 : 209 - 220
  • [9] Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure
    Xu, Fei
    Li, Li-Ping
    Zhang, Qian-Qing
    Wang, Zhe-Chao
    He, Peng
    GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 243 - 250
  • [10] Study on the Mechanical Characteristics and Ground Surface Settlement Influence of the Rise-Span Ratio of the Pile-Beam-Arch Method
    Lv, Jianbing
    Lu, Jianjun
    Wu, Hao
    APPLIED SCIENCES-BASEL, 2023, 13 (09):