ROBUST SEMICONDUCTOR PRODUCTION PLANNING UNDER YIELD UNCERTAINTY

被引:0
|
作者
Lowe, Jonathan J. [1 ]
Khademi, Amin [1 ]
Mason, Scott J. [1 ]
机构
[1] Clemson Univ, Dept Ind Engn, Freeman Hall, Clemson, SC 29634 USA
关键词
CAPACITY; MODELS;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Uncertainty throughout the semiconductor manufacturing process is both dependable yet inevitable. We present a robust optimization approach to production planning under uncertainty in semiconductor manufacturing. A sensitivity analysis was completed with a representative industrial dataset to verify those uncertain aspects that most affect our model: process yield out of wafer fabrication and test vendors. As the manufacturer can utilize multiple vendors for these steps, a case study was performed using actual industry data in which the number of vendors experiencing yield uncertainty was varied. Based on results, uncertainty in yield resulted in both higher first month costs and higher costs over the planning horizon; uncertainty at test results in greater cost increases than uncertainty at wafer fabrication, due to uncertainty occurring later in the supply chain. However, specific to our data, the cost of a robust solution is minimal when compared to demand lost under a deterministic solution.
引用
收藏
页码:2697 / 2708
页数:12
相关论文
共 50 条
  • [1] Production planning for semiconductor manufacturing under demand and yield uncertainty
    Rashidi, Eghbal
    Bhuiyan, Tanveer Hossain
    Mason, Scott J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 196
  • [2] Robust Possibilistic Production Planning Under Budgeted Demand Uncertainty
    Guillaume, Romain
    Kasperski, Adam
    Zielinski, Pawel
    2020 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE), 2020,
  • [3] Affinely Adjustable Robust Model for Multiperiod Production Planning Under Uncertainty
    Kim, Byung Soo
    Do Chung, Byung
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2017, 64 (04) : 505 - 514
  • [4] A robust optimisation model for production planning and pricing under demand uncertainty
    Ardjmand, Ehsan
    Weckman, Gary R.
    Young, William A., II
    Bajgiran, Omid Sanei
    Aminipour, Bizhan
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (13) : 3885 - 3905
  • [5] Robust process planning under uncertainty
    Ahmed, S
    Sahinidis, NV
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (05) : 1883 - 1892
  • [6] ROBUST CAPACITY PLANNING UNDER UNCERTAINTY
    PARASKEVOPOULOS, D
    KARAKITSOS, E
    RUSTEM, B
    MANAGEMENT SCIENCE, 1991, 37 (07) : 787 - 800
  • [7] Robust process planning under uncertainty
    Ahmed, Shabbir
    Sahinidis, Nikolaos V.
    Industrial and Engineering Chemistry Research, 1998, 37 (05): : 1883 - 1892
  • [8] Robust Production Planning with Remanufacturing and Heterogeneous Demands under Return and Demand Uncertainty
    Jing, Yi
    Wang, Xu
    Li, Wenchuan
    Deng, Lei
    INTERNATIONAL JOURNAL OF APPLIED MATHEMATICS & STATISTICS, 2013, 41 (11): : 183 - 196
  • [9] Robust Optimization Model for Fan Coil Production Planning under Supply Uncertainty
    Nazemi, Jamshid
    Zakeri, Roja
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 367 - 371
  • [10] Integrated production planning and order acceptance under uncertainty: A robust optimization approach
    Aouam, Tarik
    Brahimi, Nadjib
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 228 (03) : 504 - 515