Multi-project Scheduling with Multi-factor Disruptions under Uncertain Environments

被引:0
|
作者
Wang Weixin [1 ]
Ge Xianlong [2 ]
Su Jiafu [3 ,4 ]
机构
[1] Sichuan Int Studies Univ, Res Ctr Int Business & Econ, Int Business Sch, Chongqing, Peoples R China
[2] Chongqing Jiaotong Univ, Sch Econ & Management, Chongqing, Peoples R China
[3] Chongqing Technol & Business Univ, Natl Res Base Intelligent Mfg Serv, Chongqing, Peoples R China
[4] Chongqing Technol & Business Univ, Chongqing Key Lab Elect Commerce & Supply Chain S, Chongqing, Peoples R China
关键词
multi-project scheduling; multi-factor disruptions; uncertain environments; optimization model; MODEL;
D O I
10.1109/icitm.2019.8710663
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, the effects of uncertain factors on the project scheduling with multi-factor disruptions problems is analyzed, considering the effects of customer satisfaction, cost and available resource. Its objective is to make reasonable disturbance recovery strategy and minimize disturbance in the project scheduling under the limit of resource constraints and project duration. The model of multi-project scheduling model with multi-disturbances is established, and the dual-population genetic algorithm is designed to solve this problem. Through the analysis, it is found that for multi-project scheduling problem with interferences, using local heavy scheduling scheme can conform to the actual needs of the project, and can more quickly making plan to restore the interference events affect scheduling system.
引用
收藏
页码:295 / 300
页数:6
相关论文
共 50 条
  • [1] Resource-constrained project scheduling problem with multi-factor disruptions
    College of Computer Science and Information Engineering, Zhejiang Gongshang University, Hangzhou 310018, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 2012, 11 (2409-2418):
  • [2] Proactive and Reactive Multi-Project Scheduling in Uncertain Environment
    Wang, Weixin
    Ge, Xianlong
    Li, Lvcheng
    Su, Jiafu
    IEEE ACCESS, 2019, 7 : 88986 - 88997
  • [3] Multi-project scheduling
    Ohmae, Yoshitsugu
    Hasegawa, Susumu
    Okuda, Minoru
    Journal of information processing, 1992, 15 (02) : 267 - 279
  • [4] Online Scheduling in Multi-project Environments: A Multi-agent Approach
    Alberto Arauzo, Jose
    Manuel Galan, Jose
    Pajares, Javier
    Lopez-Paredes, Adolfo
    7TH INTERNATIONAL CONFERENCE ON PRACTICAL APPLICATIONS OF AGENTS AND MULTI-AGENT SYSTEMS (PAAMS 2009), 2009, 55 : 293 - +
  • [5] Optimization of batch production scheduling under multi-factor uncertain conditions
    Zheng B.
    Shi B.
    Yan L.
    Huagong Xuebao/CIESC Journal, 2020, 71 (03): : 1246 - 1253
  • [6] A Multi-PR Heuristic for Distributed Multi-Project Scheduling With Uncertain Duration
    Liu, Dongning
    Xu, Zhe
    IEEE ACCESS, 2020, 8 : 227780 - 227792
  • [7] Research on the multi-project task scheduling under multi-resource constraints
    School of Mechanical and Electrical Engineering, Harbin Institute of Technology, Harbin 150001, China
    不详
    Harbin Gongye Daxue Xuebao, 2007, 7 (1045-1049):
  • [8] MULTI-PROJECT SCHEDULING - ANALYSIS OF PROJECT PERFORMANCE
    KURTULUS, IS
    NARULA, SC
    IIE TRANSACTIONS, 1985, 17 (01) : 58 - 66
  • [9] A DECOMPOSITION APPROACH TO MULTI-PROJECT SCHEDULING
    DECKRO, RF
    WINKOFSKY, EP
    HEBERT, JE
    GAGNON, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) : 110 - 118
  • [10] MULTI-PROJECT SCHEDULING WITH RESOURCE CONSTRAINS
    HIRAOKA, T
    BULLETIN OF THE JSME-JAPAN SOCIETY OF MECHANICAL ENGINEERS, 1980, 23 (185): : 1929 - 1936