Field Investigation of Blasting-Induced Vibration in Concrete Linings during Expansion of Old Highway Tunnel

被引:7
|
作者
Wang, Ya-Qiong [1 ,2 ]
Gong, Lin-Jin [1 ]
An, Nan-Nan [1 ]
Peng, Xing-Bin [1 ]
Wang, Wei [1 ,2 ,3 ]
Wang, Zhi-Feng [1 ,2 ]
机构
[1] Changan Univ, Sch Highway, Xian 710064, Peoples R China
[2] Shaanxi Prov Major Lab Highway Bridge & Tunnel, Xian 710064, Peoples R China
[3] CCCC Second Harbour Engn Co Ltd, Wuhan 430040, Hubei, Peoples R China
基金
国家重点研发计划;
关键词
D O I
10.1155/2021/8820544
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Numerous mountain highway tunnels in China do not satisfy the current traffic design standards and therefore need to be rebuilt or expanded. The drilling-blasting method is the primary method employed in China for expanding mountain highway tunnels, and it is crucial to monitor the vibrations caused by blasting. This study conducted a field investigation of the vibrations caused by blasting during the expansion of Yujiaya tunnel, which was built in 1999. The blasting-induced vibrations in the new and old concrete linings were monitored and analyzed during the expansion. The measured values of the peak particle velocity (PPV) varied within the range of 0.097-8.246 cm/s. The attenuation law of the PPV was determined via a regression analysis using Sadovsky's empirical formula. The relationship between the main vibration frequency and the distance from the blasting source was expressed as a power function. Finally, the safety distances of the concrete linings subject to blasting vibrations were analyzed and discussed.
引用
收藏
页数:11
相关论文
共 8 条
  • [1] Investigation and Control of the Blasting-Induced Ground Vibration under Cold Condition
    Hu, Yingguo
    Yang, Zhaowei
    Yao, Erlei
    Liu, Meishan
    Rao, Yu
    SHOCK AND VIBRATION, 2021, 2021
  • [2] Precutting of tunnel perimeter for reducing blasting-induced vibration and damaged zone — numerical analysis
    Ki-Il Song
    Tae-Min Oh
    Gye-Chun Cho
    KSCE Journal of Civil Engineering, 2014, 18 : 1165 - 1175
  • [3] Blasting-Induced Vibration Response of the Transition Section in a Branching-Out Tunnel and Vibration Control Measures
    Cao, Feng
    Zhang, Sheng
    Ling, Tonghua
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [4] Precutting of tunnel perimeter for reducing blasting-induced vibration and damaged zone - numerical analysis
    Song, Ki-Il
    Oh, Tae-Min
    Cho, Gye-Chun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (04) : 1165 - 1175
  • [5] Blasting-Induced Ground Vibration Modeling in Tunnel Excavation: A Comparative Study of ANN, Hybrid ANNs, and Empirical Models
    Ogunsola, Nafiu Olanrewaju
    Shin, Chanhwi
    Lawal, Abiodun Ismail
    Kim, Young-Keun
    Cho, Sangho
    ROCK MECHANICS AND ROCK ENGINEERING, 2024, : 2711 - 2737
  • [6] Characteristics of Vibration Waves Measured in Concrete Lining of Excavated Tunnel during Blasting in Adjacent Tunnel
    Zhang, Qingbin
    Zhang, Zongxian
    Wu, Congshi
    Yang, Junsheng
    Wang, Zhenyu
    COATINGS, 2022, 12 (07)
  • [7] Numerical Simulation and Field Monitoring of Blasting Vibration for Tunnel In-Situ Expansion by a Non-Cut Blast Scheme
    Guan, Zhenchang
    Xie, Lifu
    Chen, Dong
    Shi, Jingkang
    SENSORS, 2024, 24 (14)
  • [8] Multiscale modeling for fire induced spalling in concrete tunnel linings based on the superposition-based phase field fracture model
    Cheng, Panpan
    Zhu, Hehua
    Yan, Zhiguo
    Shen, Yi
    Fish, Jacob
    COMPUTERS AND GEOTECHNICS, 2022, 148