Determination methodology for optimising the energy storage size for power system

被引:70
作者
Chakraborty, S. [1 ]
Senjyu, T. [1 ]
Toyama, H. [1 ]
Saber, A. Y. [2 ]
Funabashi, T. [3 ]
机构
[1] Univ Ryukyus, Fac Engn, Nishihara, Okinawa 9030213, Japan
[2] Missouri Univ Sci & Technol, Dept Elect & Comp Engn, Rolla, MO 65409 USA
[3] Meidensha Corp, Shinagawa Ku, Tokyo 1416029, Japan
关键词
UNIT COMMITMENT; BATTERY;
D O I
10.1049/iet-gtd.2008.0300
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A methodology for determining the optimal size of energy storage system (ESS) integrated with thermal power system is presented in this study. The optimal size is characterised by the rated stored energy and the maximum power rating of installed ESS for which the power system can achieve maximum revenue. Therefore the ESS cost formulation is conducted by analysing economic cost benefit measures considering life cycle of ESS. Since unit commitment (UC) scheduling is an important and integral part of power system cost optimisation, this study considers the operating schedule of thermal units (TU) while resolving ESS schedule. This proposed method uses tabu search (TS)-based evolutionary technique for solving this optimisation problem. TS is included in this algorithm to avoid re-evaluation of already evaluated ESS size which is powered by max priority heap and hash table data structure. The weekly schedule period is considered instead of daily to achieve more precise results. The proposed method is applied in two different power systems to determine the appropriate size of to be installed ESS. Experimental results reported that establishing the proposed method is an effective one to compute the optimal size of ESS for different sized power systems.
引用
收藏
页码:987 / 999
页数:13
相关论文
共 22 条
[1]   Impact of energy storage costs on economical performance in a distribution substation [J].
Abou Chacra, F ;
Bastard, P ;
Fleury, G ;
Clavreul, W .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :684-691
[2]   Assessment of utility side cost savings from battery energy storage - Discussion [J].
Eckroad, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1997, 12 (03) :1119-1120
[3]   SHORT-TERM GENERATION SCHEDULING IN A SMALL AUTONOMOUS SYSTEM WITH UNCONVENTIONAL ENERGY-SOURCES [J].
BAKIRTZIS, AG ;
DOKOPOULOS, PS .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) :1230-1236
[4]   Energy storage systems - Characteristics and comparisons [J].
Ibrahim, H. ;
Ilinca, A. ;
Perron, J. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2008, 12 (05) :1221-1250
[5]   OPTIMAL CAPACITY OF THE BATTERY ENERGY-STORAGE SYSTEM IN A POWER-SYSTEM [J].
LEE, TY ;
CHEN, NM .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 1993, 8 (04) :667-673
[6]  
LO CH, 1998, IEEE T POWER SYST, V14, P824
[7]   Short-term scheduling of battery in a grid-connected PV/battery system [J].
Lu, B ;
Shahidehpour, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :1053-1061
[8]   Superconducting storage systems: An overview [J].
Luongo, CA .
IEEE TRANSACTIONS ON MAGNETICS, 1996, 32 (04) :2214-2223
[9]   Short term generation scheduling in photovoltaic-utility grid with battery storage [J].
Marwali, MKC ;
Ma, HL ;
Shahidehpour, SM ;
Abdul-Rahman, KH .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (03) :1057-1062
[10]  
McDowall J, 2000, 2000 IEEE POWER ENGINEERING SOCIETY SUMMER MEETING, CONFERENCE PROCEEDINGS, VOLS 1-4, P1538, DOI 10.1109/PESS.2000.868757