Modeling Ice-Jam Floods in the Frameworks of an Intelligent System for River Monitoring

被引:7
|
作者
Krylenko, I. [1 ,2 ,3 ]
Alabyan, A. [1 ,2 ,3 ]
Aleksyuk, A. [1 ,2 ]
Belikov, V. [2 ,3 ]
Sazonov, A. [1 ,2 ,3 ]
Zavyalova, E. [1 ,2 ]
Pimanov, I. [3 ]
Potryasaev, S. [3 ]
Zelentsov, V. [3 ]
机构
[1] Moscow MV Lomonosov State Univ, Fac Geog, Moscow 119991, Russia
[2] Russian Acad Sci, Water Problems Inst, Moscow 119333, Russia
[3] Russian Acad Sci, St Petersburg Inst Informat & Automat, St Petersburg 199178, Russia
基金
俄罗斯基础研究基金会;
关键词
hydrodynamics; river ice; ice-jams; 2D-modeling; flooding; STREAM_2D; Northern Dvina; Velikiy Ustyug;
D O I
10.1134/S0097807820030069
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
The article presents the results of adaptation and application of two-dimensional hydrodynamic model STREAM_2D to reproduce the characteristics of ice-jam-induced floods in the vicinity of the city of Velikiy Ustyug (the Northern Dvina river basin, Vologda region, Russia). The additional hydraulic resistance due to ice roughness and the decrease in the flow cross-section area due to ice-caused congestion were taken into account for modeling of ice-jam-induced water level variations. The corresponding model parameters were estimated on the basis of numerical experiments and flood modeling for the period from 1980 to 2016, which includes more than 18 significant cases of ice-jamming. Grouping of model parameters by the height of the ice-jam-induced water level rises could be useful for the application of the developed model in the framework of an intelligent information system of river flood monitoring.
引用
收藏
页码:387 / 398
页数:12
相关论文
共 50 条
  • [1] Modeling Ice-Jam Floods in the Frameworks of an Intelligent System for River Monitoring
    I. Krylenko
    A. Alabyan
    A. Aleksyuk
    V. Belikov
    A. Sazonov
    E. Zavyalova
    I. Pimanov
    S. Potryasaev
    V. Zelentsov
    Water Resources, 2020, 47 : 387 - 398
  • [2] Trends in the Timing and Magnitude of Ice-Jam Floods in Canada
    Prabin Rokaya
    Sujata Budhathoki
    Karl-Erich Lindenschmidt
    Scientific Reports, 8
  • [3] Trends in the Timing and Magnitude of Ice-Jam Floods in Canada
    Rokaya, Prabin
    Budhathoki, Sujata
    Lindenschmidt, Karl-Erich
    SCIENTIFIC REPORTS, 2018, 8
  • [4] Dam removal effect on the lower St. Regis River ice-jam floods
    Huang, Fengbin
    Shen, Hung Tao
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2024, 51 (02) : 215 - 227
  • [5] Mobilization of metal-contaminated sediment by ice-jam floods
    Moore, JN
    Landrigan, EM
    ENVIRONMENTAL GEOLOGY, 1999, 37 (1-2): : 96 - 101
  • [6] The spatial variability of ice-jam bank morphologies along the Mistassini River (Quebec, Canada): an indicator of the ice-jam regime?
    Stephanie Morin
    Etienne Boucher
    Thomas Buffin-Belanger
    Natural Hazards, 2015, 77 : 2117 - 2138
  • [7] The spatial variability of ice-jam bank morphologies along the Mistassini River (Quebec, Canada): an indicator of the ice-jam regime?
    Morin, Stephanie
    Boucher, Etienne
    Buffin-Belanger, Thomas
    NATURAL HAZARDS, 2015, 77 (03) : 2117 - 2138
  • [8] SIMULATION AND ANALYSIS OF UPPER NIAGARA RIVER ICE-JAM CONDITIONS
    WANG, DS
    SHEN, HT
    CRISSMAN, RD
    JOURNAL OF COLD REGIONS ENGINEERING, 1995, 9 (03) : 119 - 134
  • [9] Numerical prediction of ice-jam profiles in lower Athabasca River
    Beltaos, Spyros
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2019, 46 (08) : 722 - 731
  • [10] Laboratory modelling of ice jam floods on the Lena river
    Buzin, V. A.
    Klaven, A. B.
    Kopaliani, Z. D.
    EXTREME HYDROLOGICAL EVENTS: NEW CONCEPTS FOR SECURITY, 2007, 78 : 269 - +