Unveiling direct and indirect impacts of the Three Gorges Project for supporting synergistic water-power management

被引:2
|
作者
Han, Dengcheng [1 ]
Huang, Gordon [5 ]
Liu, Lirong [2 ]
Zhai, Mengyu [3 ]
Fu, Yupeng [1 ]
Gao, Sichen [1 ]
Li, Jianyong [4 ]
Pan, Xiaojie [4 ]
机构
[1] Univ Regina, Inst Energy Environm & Sustainable Commun, Regina, SK S4S 0A2, Canada
[2] Univ Surrey, Ctr Environm Sustainabil, Guildford GU2 7XH, Surrey, England
[3] North China Elect Power Univ, Sino Canada Resources & Environm Res Acad, Beijing 102206, Peoples R China
[4] MWR&CAS, Inst Hydroecol, Wuhan 430079, Peoples R China
[5] Univ Regina, Environm Syst Engn Program, Fac Engn & Appl Sci, Regina, SK S4S0A2, Canada
关键词
Top-down impact assessment; Factorial analysis; Three Gorges Project; Water-energy synergistic management; STRUCTURAL PATH-ANALYSIS; HYDROPOWER PROJECTS; RESERVOIR; CHINA; MODEL; RESETTLEMENT; ASSESSMENTS; EMISSIONS; POLICY; AREAS;
D O I
10.1016/j.jclepro.2022.130547
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Large-scale hydraulic projects (LHPs) have played an essential role in the development of the surrounding area. due to their multiple functions in both water and power systems. Various industries can benefit from LHPs through the supply chains differentially. However, systematic analysis to investigate such impacts at a sectoral level is lacking and the mechanism that how these LHPs can affect different sectors is still unknown. Herein a factorial top-down impact assessment model (FTIAM) is developed to evaluate the direct and indirect impacts of the Three Gorges Project (TGP) on the Yangtze River Economic Belt (YREB) from the perspective of water and power supplies at a sectoral level, and screen the factors and their interactions affecting such impacts. The vital final demand and consumption sectors inducing the most water and power-use produced by the TGP (WTGP, ETGP), as well as the related distribution patterns at different production layers will be identified. Key supply chain paths for water and power flows will also be traced to reveal how the TGP affects the whole socio-economic system step by step. Some findings are revealed: 1) Final demand is dominant to control the distribution patterns of WTGP and ETGP. 2) The distribution patterns of WTGP would change from U to L shape as final demand increases. 3) The final demand of Hubei province induces most WTGP while the area outside the YREB consumes most ETGP respectively. 4) Manufacture of foods and tobacco, and Construction are two key sectors that have a high reliance on WTGP and ETGP indirectly. For the conservation of the resources, policies within the YREB focusing on water-use efficiency of agriculture and manufacturing sectors, and power-use efficiency of sector CON and TI are essential. The enormous final demand for WTGP and ETGP in Jiangsu, Zhejiang, Hubei, Sichuan province calls for immediate actions to promote a more water-saving and energy-saving lifestyle. For the economic benefits, small or medium-size hydraulic projects might be the mainstream for the YREB in the following decades. Such results are conductive to support the synergistic management of water and energy resources within the YREB and provide a reference for promoting regionally sustainable development assisted by LHPs.
引用
收藏
页数:11
相关论文
共 6 条
  • [1] Power Production Management of Three Gorges Project
    Zhang Cheng General Manager of China Yangtze Power Co.
    Electricity, 2010, 21 (02) : 41 - 44
  • [2] Analysis of slope stability and optimizing of anchor on the entrance slope of underground water power station in the Three Gorges Project
    Li, Jianlin
    Hu, Xing'e
    Xiong, Junhua
    Yang, Xuetang
    1600, Academia Sinica (20):
  • [3] Research on Differentiated Lightning Protection Comprehensive Management for the 500-kV Power Network in the Area Near the Three Gorges Project
    Zhao Chun
    Chen Jiahong
    Gu Shanqiang
    Ruan Jiangjun
    Li Xiaolan
    Tong Xuefang
    Hu Wen
    IEEE TRANSACTIONS ON POWER DELIVERY, 2012, 27 (01) : 337 - 352
  • [4] A Bayesian-based two-stage inexact optimization method for supporting stream water quality management in the Three Gorges Reservoir region
    X. H. Hu
    Y. P. Li
    G. H. Huang
    X. W. Zhuang
    X. W. Ding
    Environmental Science and Pollution Research, 2016, 23 : 9164 - 9182
  • [5] A Bayesian-based two-stage inexact optimization method for supporting stream water quality management in the Three Gorges Reservoir region
    Hu, X. H.
    Li, Y. P.
    Huang, G. H.
    Zhuang, X. W.
    Ding, X. W.
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2016, 23 (09) : 9164 - 9182
  • [6] Enhanced thermal management by direct water spray of high-voltage, high power devices in a three-phase, 18-hp AC motor drive demonstration
    Shaw, MC
    Waldrop, JR
    Chandrasekaran, S
    Kagalwala, B
    Jing, X
    Brown, ER
    Dhir, VJ
    Fabbeo, M
    ITHERM 2002: EIGHTH INTERSOCIETY CONFERENCE ON THERMAL AND THERMOMECHANICAL PHENOMENA IN ELECTRONIC SYSTEMS, PROCEEDINGS, 2002, : 1007 - 1014