The development of a metallurgical flowsheet to treat tails

被引:0
|
作者
Walklate, J. R.
Jeram, H.
机构
关键词
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
The imenite, rutile and zircon processes of the Mineral Separation Plant generate tailing streams, which still contain valuable mineral. This is due to a combination of factors, which include separator equipment efficiency, particle size effects and inefficient operating practices (equipment overloading, blockage, etc.). Recent developments by metallurgical equipment suppliers have led to increased mineral separator performance enabling recovery of previously lost valuable mineral. Mineralogical studies were conducted using QEM*SEM and MLA techniques to identify and quantify gangue mineral species and determine mineral association. Laboratory and pilot-scale test work was then conducted to develop suitable process flowsheets for the recovery of ilmenite, rutile and zircon from current and stockpiled tailings.
引用
收藏
页码:45 / 53
页数:9
相关论文
共 50 条
  • [1] FLOWSHEET AUDITING FOR IMPROVED METALLURGICAL PERFORMANCE.
    Malhotra, D.
    Minerals and Metallurgical Processing, 1987, 4 (04): : 203 - 206
  • [2] Recycling spent lithium batteries–an overview of pretreatment flowsheet development based on metallurgical factors
    Khodadadmahmoudi G.
    Javdan Tabar K.
    Homayouni A.H.
    Chehreh Chelgani S.
    Environmental Technology Reviews, 2023, 12 (01)
  • [3] METALLURGICAL PLANT OPTIMIZATION THROUGH THE USE OF FLOWSHEET SIMULATION MODELLING
    Kennedy, Mark William
    CELEBRATING THE MEGASCALE: PROCEEDINGS OF THE EXTRACTION AND PROCESSING DIVISION SYMPOSIUM ON PYROMETALLURGY IN HONOR OF DAVID G.C. ROBERTSON, 2014, : 367 - 375
  • [4] LIFE CYCLE ASSESSMENT OF METALLURGICAL PROCESSES BASED ON PHYSICAL FLOWSHEET MODELS
    Scheidema, Madeleine
    Reuter, Markus
    Roine, Antti
    TOWARDS MATERIALS RESOURCE SUSTAINABILITY (REWAS 2016), 2016, : 179 - 185
  • [5] Principal processing flowsheet of copper–brass wastes of metallurgical brass production
    E. S. Kondratyeva
    A. F. Gubin
    V. A. Kolesnikov
    Russian Journal of Non-Ferrous Metals, 2017, 58 : 206 - 211
  • [6] Principal processing flowsheet of copper-brass wastes of metallurgical brass production
    Kondratyeva, E. S.
    Gubin, A. F.
    Kolesnikov, V. A.
    RUSSIAN JOURNAL OF NON-FERROUS METALS, 2017, 58 (03) : 206 - 211
  • [7] The Sepon Copper Project: Development of a flowsheet
    Baxter, K
    Dreisinger, D
    Pratt, G
    HYDROMETALLURGY 2003 PROCEEDINGS, VOLS 1 AND 2: VOL 1: LEARNING AND SOLUTION PURIFICATION, 2003, : 1487 - 1502
  • [8] ENVIRONMENTAL CONSIDERATIONS IN GOLD FLOWSHEET DEVELOPMENT
    LAWRENCE, RW
    MARCHANT, PB
    CIM BULLETIN, 1987, 80 (902): : 89 - 89
  • [9] DEVELOPMENT OF THE MCLAUGHLIN GOLD MINE FLOWSHEET
    CONWAY, MH
    JOURNAL OF METALS, 1984, 36 (12): : 37 - 37
  • [10] Process flowsheet development for the Pullalli project
    Boster, B
    Pickarts, J
    McPartland, J
    PRACTICAL ASPECTS OF INTERNATIONAL MANAGEMENT AND PROCESSING, 1996, : 19 - 20