共 50 条
- [8] Validation and verification of the simulation model of a photolithography process in semiconductor manufacturing 1998 WINTER SIMULATION CONFERENCE PROCEEDINGS, VOLS 1 AND 2, 1998, : 1017 - 1022
- [9] Maximizing productivity improvements using Short Cycle Time Manufacturing (SCM) concepts in a semiconductor manufacturing line 2000 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP, 2000, : 63 - 67
- [10] Resin transfer molding process optimization for minimum cycle-time JOURNAL OF ADVANCED MATERIALS, 1996, 28 (01): : 9 - 18