IGCC power plant for biomass utilisation, Varnamo, Sweden

被引:105
|
作者
Stahl, K [1 ]
Neergaard, M [1 ]
机构
[1] Sydkraft AB, S-20509 Malmo, Sweden
来源
BIOMASS & BIOENERGY | 1998年 / 15卷 / 03期
关键词
biomass; gasification plant; combined cycles;
D O I
10.1016/S0961-9534(98)00025-7
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
Sydkraft AB has built the world's first complete IGCC Power Plant which utilises wood as fuel. The plant is located in Varnamo, Sweden, and the technology used in the power plant is based on gasification in a pressurised circulating fluidised bed gasifier. The gasification technology is developed in co-operation between Sydkraft AB and Foster Wheeler Energy International Inc., who also supplied the gasification plant. The plant at Varnamo produces about 6 MWe electricity to the grid, as well as 9 MWth heat to the district heating system in the city of Varnamo, from a total fuel input equivalent to 18 MW. The Varnamo plant is an important step forward in developing highly efficient and environmentally acceptable technologies based on biomass fuels. Experiences gained in this co-generation plant will be utilised in the design of new and larger plants which will generate twice as much electricity as a conventional steam cycle plant with the same amount of heat demand. The start-up phase was completed during spring 1996 and the plant is now available for research and development work. A demonstration programme was launched in 1996, which will continue for some years, and during this period advantages and possible limitations of the new technology will be evaluated. Specific areas of interest include environmental issues, fuel flexibility and production costs in future facilities in addition to the technical development and improvements of the plant. As only part of the programme has yet performed, many of the tests still remain and accordingly must be reported at a later opportunity. However, operating experience with a fully integrated plant i.e. gas turbine on 100% gas, had by March 1997 exceeded 950 hours. (C) 1998 Published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:205 / 211
页数:7
相关论文
共 50 条
  • [1] Experiences from the biomass fuelled IGCC plant at Varnamo
    Ståhl, K
    Neergaard, M
    BIOMASS FOR ENERGY AND INDUSTRY, 1998, : 291 - 294
  • [2] THE IGCC DEMONSTRATION PLANT AT VARNAMO
    LUNDQVIST, RG
    BIORESOURCE TECHNOLOGY, 1993, 46 (1-2) : 49 - 53
  • [3] Co-gasification of coal and biomass in an IGCC power plant: Gasifier modeling
    Usón, Sergio
    Valero, Antonio
    Correas, Luis
    Martínez, Ángel
    International Journal of Thermodynamics, 2004, 7 (04) : 165 - 172
  • [4] Co-gasification of coal-petcoke and biomass in the Puertollano IGCC power plant
    Sofia, Daniele
    Coca Llano, Pilar
    Giuliano, Aristide
    Iborra Hernandez, Mariola
    Garcia Pena, Francisco
    Barletta, Diego
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 2014, 92 (08): : 1428 - 1440
  • [5] The realisation of a biomass-fuelled IGCC plant in Italy
    de Lange, HJ
    Barbucci, P
    BIOMASS: A GROWTH OPPORTUNITY IN GREEN ENERGY AND VALUE-ADDED PRODUCTS, VOLS 1 AND 2, 1999, : 1079 - 1085
  • [6] Biomass IGCC
    Salo, K
    Keranen, H
    POWER PRODUCTION FROM BIOMASS II WITH SPECIAL EMPHASIS ON GASIFICATION AND PYROLYSIS R&DD, 1996, 164 : 23 - 39
  • [7] Pressurized CFB gasification -: The Varnamo plant
    Ståhl, K
    Neergaard, M
    Nilsson, PA
    BIOMASS GASIFICATION AND PYROLYSIS: STATE OF THE ART AND FUTURE PROSPECTS, 1997, : 160 - 171
  • [8] VVBGC demonstration plant activities at Varnamo
    Bengtsson, Sune
    BIOMASS & BIOENERGY, 2011, 35 : S16 - S20
  • [9] SWEDEN WARMS TO BIOMASS POWER
    COLLINS, P
    NATURE, 1979, 281 (5733) : 621 - 622
  • [10] THERMODYNAMIC ANALYSIS AND OPTIMIZATION FOR AN IGCC POWER PLANT
    Zhang, Huisheng
    Huang, Di
    Lu, Zhenhua
    Su, Ming
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2014, VOL 3A, 2014,