共 1 条
Research on WBS-CBS Model for Single-Ship Repair Projects
被引:1
|作者:
Jiang, Meng-yuan
[1
]
Liu, Xiao-bing
[1
]
Yu, Shang-yuan
[1
]
Scheibler, J.
[1
]
机构:
[1] Dalian Univ Technol, Fac Econ & Management, Dalian 116024, Peoples R China
关键词:
CBS;
Single-ship repairs project;
Ship repair quotation;
WBS;
WORK BREAKDOWN STRUCTURE;
COST;
D O I:
10.2991/978-94-6239-148-2_67
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
Estimate programs used in the ship repair industry currently lack repair industry specific needs for a smooth and fast way to give quotes. This research is based on relevant literature to create a WBS-CBS model for single-repair projects. This model using the WBS method breaks single-ship repair projects into work packages. Meanwhile, the cost breakdown structure analyzes the composition of single-ship repair projects. The research provides a modular quotation for ship-repair enterprisess.
引用
收藏
页码:679 / 690
页数:12
相关论文