共 50 条
- [1] Study on geometrical morphology of the sheared drill pipe of shear ram blowout preventer Chuan Bo Li Xue/Journal of Ship Mechanics, 2021, 25 (04): : 462 - 470
- [2] Evaluation of Fracture Sectional Raised Height of the Sheared Drill Pipe in Shear Ram Blowout Preventer Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2019, 51 (02): : 176 - 184
- [4] Acoustic Emission Testing Research of Blowout Preventer ADVANCES IN ACOUSTIC EMISSION TECHNOLOGY, 2017, 179 : 335 - 343
- [6] EXPERIENCE OF USING THE UNIVERSAL ROTATING BLOWOUT PREVENTER UVP-230 BY 210 NEFTYANOE KHOZYAISTVO, 1982, (04): : 75 - 77
- [8] Reliability research on subsea wellhead connector of blowout preventer stack Zhongguo Shiyou Daxue Xuebao (Ziran Kexue Ban)/Journal of China University of Petroleum (Edition of Natural Science), 2013, 37 (05): : 140 - 144
- [10] MULTIDISCIPLINARY OPTIMIZATION-ENABLED DESIGN AUTOMATION AND OPTIMIZATION FOR BLOWOUT PREVENTER PIPE RAMS PROCEEDINGS OF THE ASME 2020 INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, IMECE2020, VOL 6, 2020,