Flow shop scheduling problems under uncertainty based on fuzzy cut-set

被引:0
|
作者
Xu, ZH [1 ]
Gu, XS [1 ]
机构
[1] E China Univ Sci & Technol, Res Inst Automat, Shanghai 200237, Peoples R China
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Produetion scheduling is an important,part in the factories, and there are various uncertainties in the production, scheduling of industrial processes. A scheduling mathematical, model for flow shop problems with uncertain processing time has been,established based on fuzzy programming theory. And in this paper, thefuzzy model can be translated into two mathematical models about the characteristic of scheduling problems. Furthermore, a fuzzy immune scheduling algorithm combined with the feature of the Immune Algorithm is proposed, which-prevents the possibility of stagnation in the iteration process and achieves fast convergence for global optimization. The effectiveness and efficiency of the fuzzy scheduling model and the proposed algorithm are demonstrated. by simulation results.
引用
收藏
页码:880 / 889
页数:10
相关论文
共 50 条
  • [1] Parametric Sensitivity Analysis of Fuzzy Reliability based on the Cut-set of Fuzzy Mathematics
    Cheng, X. J.
    FUNCTIONAL MANUFACTURING TECHNOLOGIES AND CEEUSRO I, 2010, 426-427 : 60 - 64
  • [2] Cut-Set Bounds on Network Information Flow
    Thakor, Satyajit
    Grant, Alex
    Chan, Terence
    IEEE TRANSACTIONS ON INFORMATION THEORY, 2016, 62 (04) : 1850 - 1865
  • [3] Scheduling Algorithms for a Hybrid Flow Shop under Uncertainty
    Schumacher, Christin
    Buchholz, Peter
    ALGORITHMS, 2020, 13 (11) : 1 - 26
  • [4] Tardiness in Fuzzy Flow Shop Scheduling Problems Based on Possibility and Necessity Measures
    Lai, Peng-Jen
    Shu, Ming-Hung
    ISDA 2008: EIGHTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND APPLICATIONS, VOL 3, PROCEEDINGS, 2008, : 437 - +
  • [5] An approach for earliness and tardiness scheduling problems of flow shop with uncertainty
    Xu, Zhenhao
    Gu, Xingsheng
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 7317 - 7321
  • [6] Flow shop scheduling under uncertainty based on grey chance constrained programming
    Li, B
    Gu, XS
    System Simulation and Scientific Computing, Vols 1 and 2, Proceedings, 2005, : 1247 - 1252
  • [7] Study of cut-set distributions in the fuzzy reliability evaluation models
    Zhang, Meng
    Yang, Yang
    Wang, Hui
    Wang, Liang
    APPLIED MATHEMATICAL MODELLING, 2020, 88 (88) : 142 - 160
  • [8] Integrated preventive maintenance and flow shop scheduling under uncertainty
    Seif, Javad
    Dehghanimohammadabadi, Mohammad
    Yu, Andrew Junfang
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2020, 32 (04) : 852 - 887
  • [9] Integrated preventive maintenance and flow shop scheduling under uncertainty
    Javad Seif
    Mohammad Dehghanimohammadabadi
    Andrew Junfang Yu
    Flexible Services and Manufacturing Journal, 2020, 32 : 852 - 887
  • [10] Earliness/tardiness flow-shop scheduling under uncertainty
    Li, SF
    Zhu, YL
    Li, XY
    ICTAI 2005: 17TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2005, : 499 - 506