Real-time high-speed train rescheduling in case of a complete blockage

被引:119
|
作者
Zhan, Shuguang [1 ]
Kroon, Leo G. [2 ,3 ]
Veelenturf, Lucas P. [4 ]
Wagenaar, Joris C. [3 ]
机构
[1] Southwest Jiaotong Univ, Sch Transportat & Logist, Chengdu, Peoples R China
[2] Netherlands Railways, Proc Qual & Innovat, Utrecht, Netherlands
[3] Erasmus Univ, Rotterdam Sch Management, NL-3000 DR Rotterdam, Netherlands
[4] Eindhoven Univ Technol, Sch Ind Engn, NL-5600 MB Eindhoven, Netherlands
基金
中国国家自然科学基金;
关键词
High speed railway; Segment blockages; Train rescheduling; Real-time control; DELAY MANAGEMENT;
D O I
10.1016/j.trb.2015.04.001
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper focuses on real-time rescheduling of railway traffic on a high speed railway line in case of a complete blockage of the railway infrastructure. Due to the disruption, all tracks in a railway segment are out of order for a certain period of time. In the situation that we consider, trains that are blocked by the disruption do not return to their origin by taking over train services in the opposite direction, but wait inside the stations until the disruption is over. Thus the main decisions to be taken are the following: in which stations do trains have to wait, in which order do they have to leave when the disruption is over, and which trains have to be canceled? A Mixed Integer Programming model is formulated to minimize the total weighted train delay and the number of canceled trains, while adhering to headway and station capacity constraints. Most instances can be solved in a single optimization run, but for the most complex instances we propose a two-stage optimization approach to improve the computational efficiency. The model is tested on real-world instances of the Beijing-Shanghai high speed railway line. The results show that the model is promising for reducing the effect of a disruption on passenger service, especially in comparison with a heuristic method used in practice. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:182 / 201
页数:20
相关论文
共 50 条
  • [1] A Real-time Train Timetable Rescheduling Approach to High-speed Railway
    Gao, Xinyu
    2019 CHINESE AUTOMATION CONGRESS (CAC2019), 2019, : 2024 - 2029
  • [2] An Automatic Train Operation Based Real-Time Rescheduling Model for High-Speed Railway
    Liu, Fan
    Xun, Jing
    MATHEMATICS, 2023, 11 (21)
  • [3] Real-time high-speed train rescheduling based on a Human-Computer Interaction framework
    Wenhao Zhu
    Tao Zhang
    Zhipeng Ying
    Zhengwen Liao
    Xiaojie Luan
    Lingyun Meng
    High-speed Railway, 2023, 1 (02) : 130 - 140
  • [4] A Bi-level Real-time Rescheduling Approach for Train Operation in High-speed Railways
    Liu, Fan
    Xun, Jing
    Dong, Hairong
    Zhang, Zixuan
    Li, Yanyan
    2021 IEEE INTELLIGENT TRANSPORTATION SYSTEMS CONFERENCE (ITSC), 2021, : 2417 - 2422
  • [5] An efficient evolutionary algorithm for high-speed train rescheduling under a partial station blockage
    Wang, Rongsheng
    Zhang, Qi
    Dai, Xuewu
    Yuan, Zhiming
    Zhang, Tao
    Ding, Shuxin
    Jin, Yaochu
    APPLIED SOFT COMPUTING, 2023, 145
  • [6] A High-speed Train Timetable Rescheduling Approach in case of Disturbances
    Gao, Xinyu
    2019 8TH INTERNATIONAL CONFERENCE ON TRANSPORTATION AND TRAFFIC ENGINEERING (ICTTE 2019), 2020, 308
  • [7] A Real-Time Information Service Platform for High-Speed Train
    Su, Ruidan
    Wen, Tao
    Yan, Weiwei
    Zhang, Kunlin
    Shi, Dayu
    Xu, Huaiyu
    JOURNAL OF COMPUTERS, 2012, 7 (09) : 2330 - 2333
  • [8] High-speed train scheduling and rescheduling models
    Estil-les, Maria del Cacho
    Bersani, Chiara
    Sacile, Roberto
    2020 IEEE 15TH INTERNATIONAL CONFERENCE OF SYSTEM OF SYSTEMS ENGINEERING (SOSE 2020), 2020, : 331 - 336
  • [9] A Real-Time Rescheduling Approach Using Loop Iteration for High-Speed Railway Traffic
    Liu, Fan
    Xun, Jing
    Liu, Ronghui
    Yin, Jiateng
    Dong, Hairong
    IEEE INTELLIGENT TRANSPORTATION SYSTEMS MAGAZINE, 2023, 15 (01) : 318 - 332
  • [10] Real-time train rescheduling in junction areas
    Chen, L.
    Schmid, F.
    Dasigi, M.
    Ning, B.
    Roberts, C.
    Tang, T.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2010, 224 (F6) : 547 - 557