Opportunistic maintenance strategy for wind turbines considering weather conditions and spare parts inventory management

被引:67
|
作者
Zhang, Chen [1 ]
Gao, Wei [1 ]
Yang, Tao [1 ]
Guo, Sheng [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Energy & Power Engn, Wuhan 430074, Hubei, Peoples R China
关键词
Wind turbine; Opportunistic maintenance; Weather conditions; Inventory management; SENSITIVITY-ANALYSIS; OPTIMIZATION; MODEL; SYSTEM; FARMS; COST; TIME; ORGANIZATION; IMPERFECT; OPERATION;
D O I
10.1016/j.renene.2018.10.076
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The wind power industry has experienced rapid growth over the past few decades, but the operation and maintenance costs have become huge challenges to achieve better economic returns and enhance the market competitiveness. In this paper, an opportunistic maintenance strategy for wind turbines considering stochastic weather conditions and spare parts management is proposed. The Markov chain model is adopted to generate wind speed time series and obtain the maintenance wait time owing to weather restrictions. The opportunistic maintenance threshold is a dynamic value related to the wind speed to reduce power generation losses. Moreover, the (s, S) inventory policy, with the reorder stock level s and maximum stock level S, is employed. Numerical examples are used to illustrate the economic advantages of the proposed strategy. Compared with a static opportunistic maintenance strategy and a strategy not considering opportunistic maintenance, the life cycle operation and maintenance cost for the proposed dynamic opportunistic maintenance strategy shows a decline of 10.927% and 18.304%, respectively. The optimal maintenance and inventory strategy is obtained with the decision variables of opportunistic maintenance reliability threshold and reorder stock level, and the effects of various applied parameters are described. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:703 / 711
页数:9
相关论文
共 50 条
  • [1] An opportunistic maintenance strategy for wind turbines
    Wang, Dameng
    Teng, Wei
    Zhang, Gaoshuran
    Qu, Xiaofeng
    Liu, Yibing
    Ma, Zhiyong
    Kusiak, Andrew
    IET RENEWABLE POWER GENERATION, 2021, 15 (16) : 3793 - 3805
  • [2] Spare Parts Planning for Offshore Wind Turbines subject to Restrictive Maintenance Conditions
    Tracht, Kirsten
    Westerholt, Jan
    Schuh, Peter
    FORTY SIXTH CIRP CONFERENCE ON MANUFACTURING SYSTEMS 2013, 2013, 7 : 563 - 568
  • [3] EFFECTS OF POWER GENERATION ON THE OPPORTUNISTIC MAINTENANCE STRATEGY FOR WIND TURBINES CONSIDERING RELIABILITY
    Zhang, Chen
    Gao, Wei
    Yang, Tao
    Guo, Sheng
    Ding, Honggang
    PROCEEDINGS OF THE ASME 13TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2018, VOL 3, 2018,
  • [4] Optimal external opportunistic maintenance for wind turbines considering wind speed
    Wang, Jinhe
    Xia, Yuqiang
    Qin, Yapeng
    Zhang, Xiaohong
    INTERNATIONAL JOURNAL OF GREEN ENERGY, 2024, 21 (09) : 2022 - 2041
  • [5] JOINT OPTIMIZATION OF STATE MAINTENANCE AND SPARE PARTS INVENTORY OF OFFSHORE WIND TURBINES BASED ON DEEP REINFORCEMENT LEARNING
    Dong W.
    Wu Y.
    Yao Q.
    Guo J.
    Zhao T.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2023, 44 (12): : 190 - 199
  • [6] Research on optimization of spare parts inventory policy considering maintenance priority
    Chen Y.-K.
    Gao Q.
    Su X.-B.
    Fang S.
    Guo C.-M.
    International Journal of System Assurance Engineering and Management, 2018, 9 (6) : 1336 - 1345
  • [7] Maintenance Optimization of Offshore Wind Turbines Based on an Opportunistic Maintenance Strategy
    Xie, Lubing
    Rui, Xiaoming
    Li, Shuai
    Hu, Xin
    ENERGIES, 2019, 12 (14)
  • [8] Opportunistic maintenance for wind turbines considering imperfect, reliability-based maintenance
    Zhang, Chen
    Gao, Wei
    Guo, Sheng
    Li, Youliang
    Yang, Tao
    RENEWABLE ENERGY, 2017, 103 : 606 - 612
  • [9] Preventive opportunistic maintenance strategy for wind turbines based on reliability
    Zhao, Hongshan
    Zhang, Lupeng
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2014, 34 (22): : 3777 - 3783
  • [10] An improved opportunistic group replacement maintenance strategy for wind turbines
    Ma, Zhiyong
    Wang, Dameng
    Wu, Shiming
    Teng, Wei
    Liu, Yibing
    ENERGY SCIENCE & ENGINEERING, 2020, 8 (10): : 3627 - 3637