Energy saving scheduling strategy for job shop under TOU and tiered electricity price

被引:11
|
作者
Xu, Erbao [1 ]
Li, Yan [1 ]
Liu, Yong [1 ]
Du, Jingyi [1 ]
Gao, Xinqin [1 ]
机构
[1] Xian Univ Technol, Sch Mech & Precis Instrument Engn, Xian 710048, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Energy saving scheduling; TOU and tiered electricity price; Firefly algorithm; PERMUTATION FLOW-SHOP; OPTIMIZATION ALGORITHM;
D O I
10.1016/j.aej.2021.06.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In view of the energy-saving scheduling problem of job shop in the order-oriented manufacturing enterprise, it is necessary to consider the energy consumption of equipment processing and standby. Considering the Time-of-Use (TOU) and tiered electricity price, a mathematical model is established by introducing the switch strategy in the idle time of equipment to reduce the cost of power consumption in production and assembly. In order to solve the discontinuous domain problem that the standard Firefly Algorithm (FA) is not suitable for workshop energy saving scheduling, an improved FA is used to solve the mathematical model. The coding, decoding and location updating of the algorithm are redesigned. A three-layer coding structure based on the workpiece sequence, starting time and switch strategy is designed; for the iterative process of work piece sequence encoding, the Hamming distance is used to replace the Euclidean distance to calculate the position distance between the firefly individuals. Precedence preservation order-based crossover (POX) crossover is used to replace the position updating operation to ensure the feasibility of the solution. Finally, the correctness of the mathematical model and the effectiveness of the algorithm are verified by examples. (C) 2021 THE AUTHORS. Published by Elsevier BV on behalf of Faculty of Engineering, Alexandria University.
引用
收藏
页码:459 / 467
页数:9
相关论文
共 50 条
  • [1] RETRACTION: Integrated Optimization Method of IPPS under TOU and Tiered Electricity Price
    Xu, E.
    Li, Y.
    Yang, M.
    Wang, Z.
    Liu, Y.
    Han, J.
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2023, 2023
  • [2] RETRACTED: Integrated Optimization Method of IPPS under TOU and Tiered Electricity Price (Retracted Article)
    Xu, Erbao
    Li, Yan
    Yang, Mingshun
    Wang, Zhenyu
    Liu, Yirou
    Han, Jiali
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021
  • [3] Study on flexible job shop scheduling problem considering energy saving
    Xiao, Yanjun
    Yin, Shanshan
    Ren, Guoqing
    Liu, Weiling
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2024, 46 (03) : 5493 - 5520
  • [4] Job-shop scheduling problem considering power cost and makespan under time-of-use electricity price
    Liang, Peng
    Chen, Wensi
    Luo, Mingqiang
    He, Wa
    Liu, Guosheng
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2019, 19 (04) : 929 - 941
  • [5] An energy-saving distributed flexible job shop scheduling with machine breakdowns
    Zhang, Hongliang
    Qin, Chaoqun
    Xu, Gongjie
    Chen, Yi
    Gao, Zhenhua
    APPLIED SOFT COMPUTING, 2024, 167
  • [6] A green scheduling algorithm for flexible job shop with energy-saving measures
    Wu, Xiuli
    Sun, Yangjun
    JOURNAL OF CLEANER PRODUCTION, 2018, 172 : 3249 - 3264
  • [7] Green Scheduling of Flexible Job Shops Based on NSGA-Ⅱ under TOU Power Price
    Liu C.
    Xu Z.
    Zhang Q.
    Zhang L.
    Yao K.
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2020, 31 (05): : 576 - 585
  • [8] Job-shop scheduling strategy under uncertain information environment
    Dep. of Industrial and Manu. System Eng., Sch. of Mech. Sci. and Eng., Huazhong Univ. of S and T, Wuhan 430074, China
    Jisuanji Jicheng Zhizao Xitong, 2006, 10 (1637-1642):
  • [9] Optimization Model for Residential Tiered Electricity Pricing Based on Peak-Valley TOU Price
    Yang, L.
    Chen, K. T.
    Tan, Z. F.
    Zhou, B. B.
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON COMPUTER INFORMATION SYSTEMS AND INDUSTRIAL APPLICATIONS (CISIA 2015), 2015, 18 : 250 - 252
  • [10] Energy Saving Optimization Method of Flexible Job Shop Scheduling Considering Preventive Maintenance
    考虑设备预维护的柔性作业车间调度节能优化方法
    Li, Congbo (congboli@cqu.edu.cn), 1600, Chinese Mechanical Engineering Society (57): : 220 - 230