共 50 条
- [1] EVALUATION OF THE RISK IN PRODUCTION SYSTEMS WITH A PARALLEL RELIABILITY STRUCTURE EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2009, (02): : 84 - 95
- [6] Analysis of productivity of technological cell taking into account its reliability 2001, Naukova dumka
- [8] Production and inventory systems taking account of time value Production Planning and Control, 1998, 9 (06): : 580 - 584
- [10] Modeling of contractor selection taking into account different risk level 25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 676 - 681