Risk Analysis Using AS/NZS 4360:2004, Bow-Tie Diagram and ALARP on Construction Projects of Banyumanik Hospital

被引:1
|
作者
Sari, Diana Puspita [1 ]
Pujotomo, Darminto [1 ]
Wardani, Nadira Kusuma [1 ]
机构
[1] Diponegoro Univ, Ind Engn Dept, Semarang, Indonesia
关键词
D O I
10.1063/1.5010630
中图分类号
O59 [应用物理学];
学科分类号
摘要
The Determination of risk is an uncertain event. Risks can have negative or positive impacts on project objectives. A project was defined as a series of activities and tasks that have a purpose, specifications, and limits of cost. Banyumanik Hospital Development Project is one of the construction projects in Semarang which have experienced some problems. The first problem is project delays on building stake. The second problem is delay of material supply. Finally, the problem that occurs is less management attention to health safety as evidenced by the unavailability of PPE for the workers. These problems will pose a risk to he a very important risk management performed by contractors at the Banyumanik Hospital Development Project to reduce the impact that would he caused by the risk borne by the provider of construction seniices. This research aim to risk identification, risk assessment- and risk mitigation. Project risk management begins with the identification of risks based On the project life cycle. The risk assessment carried out by AS/NZS 4360: 2004 to the impacts of cost, time and quality. The results obtained from the method of AS/NZS 4360: 2004 is the risk that requires the handling of mitigation. Mitigated risk is the risk that had significant and high level. There are four risks that require risk mitigation with Bow-Tie diagrams which is work accidents, contract delays, material delays and design changes. Bow-Tie diagram method is a method for identifying causal and preventive action and recovery of a risk. Results obtained from Bow-Tie diagram method is a preventive action and recovery. This action is used as input to the ALARP method. ALARP method is used to determine the priority of the strategy proposed in the category broadly acceptable, tolerable, and unacceptable.
引用
收藏
页数:12
相关论文
共 25 条
  • [1] Dynamic risk analysis using bow-tie approach
    Khakzad, Nima
    Khan, Faisal
    Amyotte, Paul
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2012, 104 : 36 - 44
  • [2] Corrosion risk assessment using adaptive bow-tie (ABT) analysis
    Taleb-Berrouane, Mohammed
    Khan, Faisal
    Hawboldt, Kelly
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 214
  • [3] Using a Proposed Risk Computation Procedure and Bow-Tie Diagram as a Method for Maritime Security Assessment
    Papageorgiou, Panayiotis
    Dermatis, Zacharias
    Anastasiou, Athanasios
    Liargovas, Panagiotis
    Papadimitriou, Stratos
    TRANSPORTATION RESEARCH RECORD, 2024, 2678 (02) : 318 - 339
  • [4] RISK ASSESSMENT IN OIL AND GAS INDUSTRY USING SIMULATION AND BOW-TIE ANALYSIS
    Kbah, Zaid
    Erdil, Nadiye O.
    Aqlan, Faisal
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2020, 27 (01): : 110 - 123
  • [5] Risk analysis of TBM tunneling projects based on generic bow-tie risk analysis approach in difficult ground conditions
    Sharafat, Abubakar
    Latif, Kamran
    Seo, Jongwon
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 111
  • [6] USE OF THE BOW-TIE METHOD FOR A PROSPECTIVE RISK ANALYSIS OF IN HOSPITAL TRANSPORTATION OF INTENSIVE CARE PATIENTS
    van Slobbe-Bijlsma, E. R.
    Dongelmans, D. A.
    van der Sluijs, A. F.
    INTENSIVE CARE MEDICINE, 2010, 36 : S400 - S400
  • [7] Hazard Analysis and Risk Assessments for Industrial Processes Using FMEA and Bow-Tie Methodologies
    Afefy, Islam H.
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2015, 14 (04): : 379 - 391
  • [8] The role of ship inspections in maritime accidents: An analysis of risk using the bow-tie approach
    Sotiralis, Panagiotis
    Louzis, Konstantinos
    Ventikos, Nikolaos P.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2019, 233 (01) : 58 - 70
  • [9] Risk analysis of ship methanol fuel system based on fuzzy Bayesian network model based on Bow-tie diagram
    Wang, Shuangshaung
    PROCEEDINGS OF THE 2024 3RD INTERNATIONAL SYMPOSIUM ON INTELLIGENT UNMANNED SYSTEMS AND ARTIFICIAL INTELLIGENCE, SIUSAI 2024, 2024, : 372 - 378
  • [10] Dynamic risk analysis of hydrogen gas leakage using Bow-tie technique and Bayesian network
    Borgheipour, H.
    Tehrani, G. M.
    Eskandari, T.
    Mohammadieh, O. C.
    Mohammadfam, I.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (11) : 3613 - 3624