CEG and High Concrete join forces for airport parking structure

被引:0
|
作者
不详
机构
来源
PCI JOURNAL | 2003年 / 48卷 / 04期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:164 / 164
页数:1
相关论文
共 50 条
  • [1] Blakeslee completes Bradley Airport parking structure
    不详
    PCI JOURNAL, 2002, 47 (05): : 139 - 139
  • [2] LA-GUARDIA-AIRPORT PARKING AND TERMINAL FRONTAGE STRUCTURE
    FASULLO, EJ
    CIVIL ENGINEERING, 1976, 46 (03): : 53 - 56
  • [3] High Concrete begins production for 200th parking structure project
    不详
    PCI JOURNAL, 1997, 42 (01): : 123 - 124
  • [4] Precast concrete parking structure lighting study
    Monahan, Donald R.
    PCI JOURNAL, 2007, 52 (06): : 89 - 98
  • [5] Precast concrete "Stars" in new parking structure
    不详
    PCI JOURNAL, 2000, 45 (06): : 129 - 129
  • [6] Louisville International Airport parking structure - Need to reality in 21 months
    Walker, HC
    Postma, MA
    AIRPORT FACILITIES: INNOVATIONS FOR THE NEXT CENTURY, 1998, : 265 - 283
  • [7] World's largest precast parking structure for Detroit Metro Airport
    不详
    PCI JOURNAL, 2000, 45 (06): : 122 - 122
  • [8] High technology by CZT cameras: It is time to join forces
    Adriana D’Antonio
    Roberta Assante
    Emilia Zampella
    Wanda Acampa
    Journal of Nuclear Cardiology, 2022, 29 : 2322 - 2324
  • [9] High technology by CZT cameras: It is time to join forces
    D'Antonio, Adriana
    Assante, Roberta
    Zampella, Emilia
    Acampa, Wanda
    JOURNAL OF NUCLEAR CARDIOLOGY, 2022, 29 (05) : 2322 - 2324
  • [10] High concrete completes two parking structures
    不详
    PCI JOURNAL, 2002, 47 (04): : 164 - 164