Due-date assignment for multi-server multi-stage assembly systems

被引:5
|
作者
Yaghoubi, Saeed [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
关键词
due-date assignment; Markov processes; queuing; assembly system; LEAD TIME CONTROL; SINGLE-MACHINE; PROCESSING TIMES; FINITE BUFFERS; PERFORMANCE ANALYSIS; UNRELIABLE MACHINES; SCHEDULING RESEARCH; QUEUING THEORY; THROUGHPUT; QUEUES;
D O I
10.1080/00207721.2013.815826
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we attempt to present a constant due-date assignment policy in a multi-server multi-stage assembly system. This system is modelled as a queuing network, where new product orders are entered into the system according to a Poisson process. It is assumed that only one type of product is produced by the production system and multi-servers can be settled in each service station. Each operation of every work is operated at a devoted service station with only one of the servers located at a node of the network based on first come, first served (FCFS) discipline, while the processing times are independent random variables with exponential distributions. It is also assumed that the transport times between each pair of service stations are independent random variables with generalised Erlang distributions. Each product's end result has a penalty cost that is some linear function of its due date and its actual lead time. The due date is calculated by adding a constant to the time that the order enters into the system. Indeed, this constant value is decided at the beginning of the time horizon and is the constant lead time that a product might expect between the time of placing the order and the time of delivery. For computing the due date, we first convert the queuing network into a stochastic network with exponentially distributed arc lengths. Then, by constructing an appropriate finite-state continuous-time Markov model, a system of differential equations is created to find the manufacturing lead-time distribution for any particular product, analytically. Finally, the constant due date for delivery time is obtained by using a linear function of its due date and minimising the expected aggregate cost per product.
引用
收藏
页码:1246 / 1256
页数:11
相关论文
共 50 条
  • [1] Lead time control in multi-server multi-stage assembly system
    Saeed Yaghoubi
    Siamak Noori
    Fatemeh Pourdadashi-Komachali
    The International Journal of Advanced Manufacturing Technology, 2012, 61 : 351 - 368
  • [2] Lead time control in multi-server multi-stage assembly system
    Yaghoubi, Saeed
    Noori, Siamak
    Pourdadashi-Komachali, Fatemeh
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4): : 351 - 368
  • [3] Scheduling requests on multi-stage multi-server to increase quality of service
    Allahverdi, A
    Al-Anzi, FS
    NETWORK CONTROL AND ENGINEERING FOR QOS, SECURITY AND MOBILITY II, 2003, 133 : 14 - 25
  • [4] DUE-DATE ASSIGNMENT TO MULTI-JOB CUSTOMER ORDERS
    BAGCHI, U
    JULIEN, FM
    MAGAZINE, MJ
    MANAGEMENT SCIENCE, 1994, 40 (10) : 1389 - 1392
  • [5] Optimal Server Assignment in Multi-Server Queueing Systems with Random Connectivities
    Halabian, Hassan
    Lambadaris, Ioannis
    Viniotis, Yannis
    JOURNAL OF COMMUNICATIONS AND NETWORKS, 2019, 21 (04) : 405 - 415
  • [6] MULTI-SERVER ASSEMBLY QUEUES
    CRANE, MA
    JOURNAL OF APPLIED PROBABILITY, 1974, 11 (03) : 629 - 632
  • [7] Protection of multi-server systems
    Stepanov, S.N.
    Konyaev, A.
    Mel'nikov, A.A.
    Metallurg, 2001, (01): : 28 - 30
  • [8] Utility Optimal Thread Assignment and Resource Allocation in Multi-Server Systems
    Lai, Pan
    Fan, Rui
    Zhang, Xiao
    Zhang, Wei
    Liu, Fang
    Zhou, Joey Tianyi
    IEEE-ACM TRANSACTIONS ON NETWORKING, 2022, 30 (02) : 735 - 748
  • [9] The performance of Due Date setting rules in assembly and multi-stage job shops: an assessment by simulation
    Thuerer, Matthias
    Huang, George
    Stevenson, Mark
    Silva, Cristovao
    Godinho Filho, Moacir
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 5949 - 5965
  • [10] DYNAMIC RULES FOR DUE-DATE ASSIGNMENT
    VIG, MM
    DOOLEY, KJ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) : 1361 - 1377