Vehicle/track impact due to passing the transition between a floating slab and ballasted track

被引:10
|
作者
Li, Z. G. [1 ]
Wu, T. X. [1 ]
机构
[1] Shanghai Jiao Tong Univ, State Key Lab Mech Syst & Vibrat, Shanghai 200240, Peoples R China
关键词
D O I
10.1007/978-3-540-74893-9_13
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
When a train runs over the transition between a floating slab track (FST) and ballasted track, wheel/rail impact forces arise because of the stiffness difference between the two kinds of track. A time-domain model is developed for the vehicle/track interaction and the characteristics of the impact are analyzed by numerical simulation using the model. Calculation results show that the wheel/rail impact load at the transition is moderate and its peak-to-peak value is only about 24 percent of the static load at a vehicle speed of 60 m/s.
引用
收藏
页码:94 / 100
页数:7
相关论文
共 50 条
  • [1] On vehicle/track impact at connection between a floating slab and ballasted track and floating slab track's effectiveness of force isolation
    Li, Z. G.
    Wu, T. X.
    VEHICLE SYSTEM DYNAMICS, 2009, 47 (05) : 513 - 531
  • [2] Modeling and Analysis of Vehicle-Track Dynamic Behavior at the Connection between Floating Slab and Non-Floating Slab Track
    Wu, L.
    Wen, Z. F.
    Xiao, X. B.
    Li, W.
    Jin, X. S.
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL STRUCTURES TECHNOLOGY, 2010, 93
  • [3] Analysis of the transition between tubular modular track and ballasted track
    Visser, D.
    Strasheim, J. A. V. B.
    Grabe, P. J.
    INSIGHTS AND INNOVATIONS IN STRUCTURAL ENGINEERING, MECHANICS AND COMPUTATION, 2016, : 103 - 109
  • [4] Multi-objective optimisation of transition zones between slab track and ballasted track using a genetic algorithm
    Aggestam, Emil
    Nielsen, Jens C. O.
    JOURNAL OF SOUND AND VIBRATION, 2019, 446 (91-112) : 91 - 112
  • [5] Study on the stiffness of transition between rubber floating slab track and common ballastless track in subway
    Wang, Runfeng
    Cai, Xiaopei
    Tang, Xueyang
    Wang, Qihao
    Journal of Railway Science and Engineering, 2022, 19 (10): : 2884 - 2892
  • [6] Field study using additional rails and an approach slab as a transition zone from slab track to the ballasted track
    Heydari-Noghabi, H.
    Zakeri, J. A.
    Esmaeili, M.
    Varandas, J. N.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2018, 232 (04) : 970 - 978
  • [7] LABORATORY TEST OF BALLASTED LADDER TRACK AND FLOATING LADDER TRACK
    Ma, Meng
    Liu, Weining
    Wu, Zongzhen
    Jin, Hao
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 222 - 226
  • [8] Performance Evaluation of a Combined Transition System in Slab-Ballasted Railway Track Using a Vehicle-Track-Substructure Interaction Model
    Heydari-Noghabi, Hamidreza
    Varandas, Jose Nuno
    Zakeri, Jabbar Ali
    Esmaeili, Morteza
    KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (09) : 3848 - 3860
  • [9] Performance Evaluation of a Combined Transition System in Slab-Ballasted Railway Track Using a Vehicle-Track-Substructure Interaction Model
    Hamidreza Heydari-Noghabi
    José Nuno Varandas
    Jabbar Ali Zakeri
    Morteza Esmaeili
    KSCE Journal of Civil Engineering, 2023, 27 : 3848 - 3860
  • [10] Railway slab vs ballasted track: A comparison of track geometry degradation
    Charoenwong, C.
    Connolly, D. P.
    Colaco, A.
    Alves Costa, P.
    Woodward, P. K.
    Romero, A.
    Galvin, P.
    CONSTRUCTION AND BUILDING MATERIALS, 2023, 378