Front-End Planning Implementation in Singapore: Status, Importance, and Impact

被引:22
|
作者
Hwang, Bon-Gang [1 ]
Ho, Jia Wei [2 ]
机构
[1] Natl Univ Singapore, Dept Bldg, Singapore 117566, Singapore
[2] EC Harris Singapore Pte Ltd, Singapore 089315, Singapore
关键词
Project planning; Front-end planning; Best practice; Performance; Construction industry; Project management;
D O I
10.1061/(ASCE)CO.1943-7862.0000456
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Front-end planning (FEP) is relatively new to the Singapore construction industry, and its importance is not yet well recognized or emphasized. Technological advancements and continuous fragmentation in the construction industry have resulted in a rapid increase in the complexity of projects, and yet this has not been matched by a concomitant increase in planning efforts. This study aims to identify the importance of FEP and its impact on project outcomes in order to encourage more organizations in Singapore to practice and benefit from it. To achieve this objective, a questionnaire was developed, and the responses from 27 companies were analyzed. The analysis revealed that only about 44% of the responding companies practiced FEP on their projects. In addition, the study quantified the amount of the budget allocated to FEP as well as the level of improvement in project performance achieved by implementing FEP. Once companies recognize their FEP implementation status, they will be at a starting point to understand its importance and impact and will be able to better manage their projects, ultimately allowing the Singapore construction industry to increase its opportunity for producing more successful projects overall. DOI: 10.1061/(ASCE)CO.1943-7862.0000456. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:567 / 573
页数:7
相关论文
共 50 条
  • [1] A Wideband Front-End Receiver Implementation on GPUs
    Kim, Scott C.
    Bhattacharyya, Shuvra S.
    IEEE TRANSACTIONS ON SIGNAL PROCESSING, 2016, 64 (10) : 2602 - 2612
  • [2] Critical activities in the front-end planning process
    George, Ryan
    Bell, Lansford C.
    Back, W. Edward
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2008, 24 (02) : 66 - 74
  • [3] A Front-End for Collaborative Task Planning on the Grid
    Phung, Hoang M.
    Hoang, Doan B.
    Lawrence, Elaine
    PROCEEDINGS OF THE 2009 INTERNATIONAL SYMPOSIUM ON COLLABORATIVE TECHNOLOGIES AND SYSTEMS, 2009, : 292 - 299
  • [4] Implementation of an acoustic front-end for speech recognition
    Albarello, Alain
    Breitschaedel, Robert
    Ciaramella, Alberto
    Lenormand, Eric
    Pacifici, Roberto
    Potage, Jean
    Riviere, Jean-Pierre
    Scheibel, Norbert
    Venuti, Giovanni
    CSELT Technical Reports, 1988, 16 (05): : 455 - 459
  • [5] IMPLEMENTATION OF FRONT-END PROCESSOR NEURAL NETWORKS
    NABET, B
    DARLING, RB
    PINTER, RB
    NEURAL NETWORKS, 1992, 5 (06) : 891 - 902
  • [6] Front-end automation and its impact on TAT
    Dadoun, R
    CLINICAL CHEMISTRY, 2001, 47 (06) : S40 - S40
  • [7] Integration of the Construction Knowledge and Expertise in Front-End Planning
    Oh, Eun Ho
    Naderpajouh, Nader
    Hastak, Makarand
    Gokhale, Sanjiv
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (02)
  • [8] Implementation of a WLAN Front-End Module with a Power Amplifier
    Ryu, Jong In
    Kim, Dongsu
    Cho, Hyun Min
    Kim, Jun Chul
    2007 ASIA PACIFIC MICROWAVE CONFERENCE, VOLS 1-5, 2007, : 309 - 312
  • [9] Implementation of SMIF in reticle production for front-end processes.: Impact on yield.
    Sikorski, R
    Gräser, A
    PHOTOMASK AND NEXT-GENERATION LITHOGRAPHY MASK TECHNOLOGY X, 2003, 5130 : 568 - 574
  • [10] IMPACT UPON SCREENERS OF FRONT-END REDESIGN
    MILLER, WT
    CANCER CHEMOTHERAPY REPORTS PART 2 SUPPLEMENT, 1975, 5 (01): : 253 - 263