Using Fuzzy-Delphi Technique to Determine the Concession Period in BOT Projects

被引:9
|
作者
Mostafa, Khanzadi [1 ]
Farnad, Nasirzadeh [2 ]
Majid, Alipour [1 ]
机构
[1] Iran Univ Sci & Technol, Sch Civil Engn, POB 16765-163, Tehran, Iran
[2] Payame Noor Univ, Tehran, Iran
关键词
component; Concession Period; Fuzzy; Delphi Technique; BOT; Risk Management; MODEL;
D O I
10.1109/ICIFE.2010.5609396
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
BOT projects are affected by several risks and uncertainties. One of the most important issues in this type of contract is to determine the length of concession period considering these uncertainties. The previous studies have developed several models to determine the concession period. However, the uncertainties are not taking into account in most of the previous works. Moreover, none of the previous researches has the capability to aggregate the opinions of different experts being involved in a project regarding the values of the uncertain input parameters. In this research, a Fuzzy-Delphi technique is implemented to determine the length of concession period considering uncertainties. Using the proposed Fuzzy-Delphi technique, the values of different uncertain factors affecting a BOT project is determined considering opinions of a group of experts. The NPV value is calculated considering the resulted aggregated values of uncertain input parameters. Finally, the concession period is determined using fuzzy approach. A case study is conducted to evaluate the performance of the proposed methodology. It is shown that the concession period is determined more effectively using the proposed approach.
引用
收藏
页码:442 / 446
页数:5
相关论文
共 50 条
  • [1] Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
    Khanzadi, Mostafa
    Nasirzadeh, Farnad
    Alipour, Majid
    AUTOMATION IN CONSTRUCTION, 2012, 22 : 368 - 376
  • [2] Using Agent-Based Modeling to Determine the Concession Period of BOT Contracts
    Abbasianjahromi, Hamidreza
    Naserkhaki, Sajad
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2023, 29 (02)
  • [3] The effect of concession period design on completion risk management of BOT projects
    Ye, Sudong
    Tiong, Robert L.K.
    2003, Routledge (21)
  • [4] A risk-adjusted decoupled-net-present-value model to determine the optimal concession period of BOT projects
    Nguyen, Nhat
    Almarri, Khalid
    Boussabaine, Halim
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2021, 11 (01) : 4 - 21
  • [5] A model for determining the optimal project life span and concession period of BOT projects
    Zhang, Xiaoling
    Bao, Haijun
    Wang, Hongdi
    Skitmore, Martin
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (03) : 523 - 532
  • [6] Alternative Model for Determining the Optimal Concession Period in Managing BOT Transportation Projects
    Lv, Junna
    Ye, Gui
    Liu, Wei
    Shen, Liyin
    Wang, Hongxia
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (04)
  • [7] Factors That Influence the Concession Period Length for Tunnel Projects under BOT Contracts
    Yu, Chenyun
    Lam, Ka Chi
    Yung, Ping
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (01) : 108 - 121
  • [8] Modeling the Concession Period and Subsidy for BOT Waste-to-Energy Incineration Projects
    Song, Jinbo
    Song, Danrong
    Zhang, Danlin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (10)
  • [9] A CONTINUOUS-TIME NPV MODEL FOR DETERMINING THE CONCESSION PERIOD OF BOT PROJECTS
    Xu, Jiang-wei
    Moon, Sungwoo
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 235 - 239
  • [10] Determination of Concession Period in Build-Operate Transfer Projects Using Fuzzy Logic
    Nasirzadeh, Farnad
    Khanzadi, Mostafa
    Alipour, Majid
    IRANIAN JOURNAL OF MANAGEMENT STUDIES, 2014, 7 (02) : 437 - 456