Optimization of Machine Repair System with Controlling Arrival and Switching Failure

被引:5
|
作者
Chang, Chia-Jung [1 ]
Chang, Fu-Min [2 ]
Ke, Jau-Chuan [3 ]
机构
[1] Natl Taichung Univ Sci & Technol, Dept Accounting Informat, Taichung 404, Taiwan
[2] Chaoyang Univ Technol, Dept Finance, Taichung 413, Taiwan
[3] Natl Taichung Univ Sci & Technol, Dept Appl Stat, Taichung 404, Taiwan
关键词
controlling arrival policy; switching failure; cost model; sensitivity analysis; QUEUING SYSTEM; N-POLICY; BALKING; INTERRELATIONSHIP; VACATIONS; SERVICE;
D O I
10.1520/JTE20130167
中图分类号
TB3 [工程材料学];
学科分类号
0805 ; 080502 ;
摘要
This study investigates the machine repair problem involving a controlling arrival policy and standbys switching failure. The operation of controlling arrival policy is that when the number of customers reaches the maintenance facility's capacity, no further arriving failed machines are allowed to enter the system until the system capacity decreases to a certain threshold value. We develop the steady-state solutions and some import system characteristics, such as the expected number of failed machines in the system, machine availability, the average switching failure rate, effective arrival rate, and expected waiting time in the system, etc. A cost model is developed to determine the optimal control policy at a minimum cost. A sensitivity analysis is also conducted to investigate the effect of changes in the system parameters on the expected cost function. Finally, we present some managerial insights through an application example.
引用
收藏
页码:1278 / 1287
页数:10
相关论文
共 50 条
  • [1] Controlling arrival for the machine repair problem with switching failure
    Chang, Fu-Min
    Ke, Jau-Chuan
    Liou, Cheng-Hwai
    IC-MSQUARE 2012: INTERNATIONAL CONFERENCE ON MATHEMATICAL MODELLING IN PHYSICAL SCIENCES, 2013, 410
  • [2] MARKOV MODEL FOR SWITCHING FAILURE OF WARM SPARES IN MACHINE REPAIR SYSTEM
    Jain, Madhu
    Shekhar, Chandra
    Shukla, Shalini
    JOURNAL OF RELIABILITY AND STATISTICAL STUDIES, 2014, 7 : 57 - 68
  • [3] FUZZY ANALYSIS OF MACHINE REPAIR PROBLEM WITH SWITCHING FAILURE AND REBOOT
    Shekhar, Chandra
    Jain, Madhu
    Bhatia, Siddharth
    JOURNAL OF RELIABILITY AND STATISTICAL STUDIES, 2014, 7 : 41 - 55
  • [4] Reliability and Sensitivity Analyses of an Unreliable Retrial Machine Repair System with Warm Standby Switching Failure
    Wang, Kuo-Hsiung
    Yen, Tseng-Chang
    Wu, Chia Huang
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2022, 29 (04)
  • [5] Dynamic Control of a Machine Repair Problem with Switching Failure and Unreliable Repairmen
    Wu, Chia-Huang
    Yang, Dong-Yuh
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2020, 45 (03) : 2219 - 2234
  • [6] Dynamic Control of a Machine Repair Problem with Switching Failure and Unreliable Repairmen
    Chia-Huang Wu
    Dong-Yuh Yang
    Arabian Journal for Science and Engineering, 2020, 45 : 2219 - 2234
  • [7] Controlling chaos in a switched arrival system
    Ushio, T
    Ueda, H
    Hirai, K
    SYSTEMS & CONTROL LETTERS, 1995, 26 (05) : 335 - 339
  • [8] Threshold N-policy machine repair problem with multiple spares and switching failure
    Gupta, Ritu
    Aravind, Ashwathy A.
    International Journal of Industrial and Systems Engineering, 2023, 45 (04) : 515 - 544
  • [9] Stochastic analysis of a priority unit standby system with repair machine failure
    Gupta, R
    Chaudhary, A
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1995, 26 (12) : 2435 - 2440
  • [10] Controlled Arrival Machine Repair Problem with Working Vacation and Reattempts
    Bhagat, Amita
    Sethi, Rachita
    Garg, Deepika
    INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2021, 6 (01) : 279 - 295