Sequence-dependent batch chemical scheduling with earliness and tardiness penalties

被引:6
|
作者
McGraw, KE [1 ]
Dessouky, MM [1 ]
机构
[1] Univ So Calif, Dept Ind & Syst Engn, Los Angeles, CA 90089 USA
关键词
D O I
10.1080/00207540110056180
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Production volume in the specialized agricultural chemical industry is typically too small to justify the capital expenditure required for continuous processing. As such, there is a trend towards building chemical processing plants for this market segment that are batch plants. Scheduling of this type of chemical plant under just-in-time operations, where both earliness and lateness penalties are included, is critical to the efficient operation of these plants. In this paper, a heuristic scheduling procedure is developed for the problem of minimizing the total weighted earliness and tardiness costs as well as the total set-up cost for the single-stage batch chemical manufacturing environment.
引用
收藏
页码:3085 / 3107
页数:23
相关论文
共 50 条