共 50 条
- [3] Flowshop sequence-dependent group scheduling with minimisation of weighted earliness and tardiness European Journal of Industrial Engineering, 2019, 13 (01): : 54 - 80
- [9] Hot rolling steel tube batch scheduling with earliness/tardiness penalties Li, J.-X. (jianxiang_li@hotmail.com), 2005, Northeast University (20):