Duration Prediction Models for Construction Projects in Middle East

被引:0
|
作者
El-Dash, Karim M. M. [1 ]
Ramadan, Osman M. O. [2 ]
Youssef, Waleed Mahfouz M. A. [3 ]
机构
[1] Benha Univ, Dept Civil Engn, Fac Engn, Shoubra, Egypt
[2] Cairo Univ, Fac Engn, Higher Technol Inst, 10th Of Ramadan City, Egypt
[3] Cairo Univ, Dept Struct Engn, Fac Engn, Giza, Egypt
关键词
construction projects; duration prediction; regression models; Middle East; COST;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction industry is one of the most influential motivators of a national economy. The success of construction projects is indispensable to sustain a robust economy. Completion time is important for construction projects, nevertheless project multifaceted objectives, sophisticated nature, inherent uncertainties, and risks are success impediments and can cause time overrun. Stochastic models and simulation scheduling techniques are developed to predict the risk and uncertainty effects on construction projects' duration. The objective of this research is to develop models that predict the activity durations based on actual data from similar projects. The study introduces comprehensive statistical regression models using historical data of about 84,000 activities in Egypt, Kuwait, and Saudi Arabia. The activities encompass engineering, procurement and construction (EPC) activities for most disciplines of construction projects. The regression models can be utilized to predict more reliably the activities' duration.
引用
收藏
页码:3924 / 3932
页数:9
相关论文
共 50 条
  • [1] Duration Prediction Models for Construction Projects: In Terms of Cost or Physical Characteristics?
    Bayram, Savas
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (06) : 2049 - 2060
  • [2] Duration prediction models for construction projects: In terms of cost or physical characteristics?
    Savas Bayram
    KSCE Journal of Civil Engineering, 2017, 21 : 2049 - 2060
  • [3] A Comparative Study of Models for the Construction Duration Prediction in Highway Road Projects of India
    Velumani, P.
    Nampoothiri, N. V. N.
    Urbanski, M.
    SUSTAINABILITY, 2021, 13 (08)
  • [4] Duration and resource constraint prediction models for construction projects using regression machine learning method
    Selvam, Gopinath
    Kamalanandhini, Mohan
    Velpandian, Muthuvel
    Shah, Sheema
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [5] OPTIMAL LABOR SCHEDULING FOR CONSTRUCTION PROJECTS IN THE MIDDLE-EAST
    TANG, JCS
    LIAO, WC
    ANNALS OF REGIONAL SCIENCE, 1984, 18 (01): : 51 - 56
  • [6] Methods used by clients to determine contingency sums for construction projects in the Middle East
    Morton-Shepherd, Lee
    Laryea, Samuel
    Zungu, Zamageda
    Kwasafo, Oscar Kwame
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2025,
  • [7] Projects/Middle East & Africa
    Rock Prod Cem Ed, (32):
  • [8] Right-of-Way Acquisition Duration Prediction Model for Highway Construction Projects
    Aleithawe, Imad
    Sinno, R. Ralph
    McAnally, William H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (04): : 540 - 544
  • [9] Determinants of construction duration for building projects in Germany
    Dursun, Onur
    Stoy, Christian
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (04) : 444 - +
  • [10] Construction duration of residential building projects in Germany
    Stoy, Christian
    Dreier, Frank
    Schalcher, Hans-Rudolf
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (01) : 52 - +