Probabilistic analysis of chloride penetration in reinforced concrete subjected to pre-exposure static and fatigue loading and wetting-drying cycles

被引:29
|
作者
Wang, Xiao-Hui [1 ,2 ]
Bastidas-Arteaga, Emilio [3 ]
Gao, Yang [4 ]
机构
[1] Heriot Watt Univ, Inst Infrastruct & Environm, Edinburgh, Midlothian, Scotland
[2] Shanghai Maritime Univ, Coll Ocean Sci & Engn, Shanghai 201306, Peoples R China
[3] Univ Nantes, UBL, Inst Res Civil & Mech Engn, Sea & Littoral Res Inst,CNRS,UMR 6183,FR 3473, Nantes, France
[4] Shanghai Municipal Engn Design Inst Grp Co Ltd, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Pre-exposure loads and wetting/drying cycle; Reliability; Chloride-induced corrosion; Random variable identification; Reinforced concrete; CLIMATE ADAPTATION STRATEGIES; TIME-DEPENDENT RELIABILITY; ECONOMIC-ASSESSMENT; LIFETIME ASSESSMENT; RC STRUCTURES; CORROSION; CRACKING; INGRESS; DAMAGE; MICROCRACKING;
D O I
10.1016/j.engfailanal.2017.11.008
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Reinforced concrete (RC) structures are subjected to environmental actions and loading that could significantly affect their serviceability and safety. Among these actions these paper focuses on the interaction between concrete cracking produced by static and fatigue loading and chloride ingress. Given the complexity of the problem and its related uncertainties, we carried out an experimental study that provided information for the probabilistic characterization of chloride ingress model parameters by accounting for static and fatigue loading effects. In the experimental part of the study RC specimens (beams) were subjected to pre-exposure loading and wetting-drying chloride exposure. At the end of the simulated chloride environmental attack, phi 100 x 120-mm cylinders were drilled out from the bottom side of the central zone of the beams and used to measure chloride profiles within the concrete cover. The probabilistic analysis of test results showed that static and fatigue loading increases both the mean and standard deviation of chloride content for concrete depths larger than 15 mm. In order to evaluate the effect of loading on modeling chloride ingress processes, experimental data was used to fit the surface chloride concentration and the chloride diffusion coefficient for an analytical chloride ingress model as random variables. The identified random variables are then used to determine the distribution of the time to corrosion initiation for the present experimental configuration and to evaluate the long-term probability of corrosion initiation for other environmental exposures and cover configurations. The overall results confirm that considering pre-exposure loading conditions has an important effect in lifetime assessment. This effect depends on the aggressiveness of the surrounding environment.
引用
收藏
页码:205 / 219
页数:15
相关论文
共 50 条
  • [1] Chloride penetration into recycled aggregate concrete subjected to wetting-drying cycles and flexural loading
    Qi, Bing
    Gao, Jianming
    Chen, Fei
    Shen, Daman
    CONSTRUCTION AND BUILDING MATERIALS, 2018, 174 : 130 - 137
  • [2] Influence of Crack Width on Chloride Penetration in Concrete Subjected to Alternating Wetting-Drying Cycles
    Lai, Jun
    Cai, Jian
    Chen, Qing-Jun
    He, An
    Wei, Mu-Yang
    MATERIALS, 2020, 13 (17)
  • [3] Corrosion behavior of epoxy-coated reinforced bars in RC test specimens subjected to pre-exposure loading and wetting-drying cycles
    Wang, Xiao-Hui
    Gao, Yang
    CONSTRUCTION AND BUILDING MATERIALS, 2016, 119 : 185 - 205
  • [4] Experimental Analysis of Chloride Penetration into Concrete Subjected to Drying-Wetting Cycles
    Lu, Chunhua
    Gao, Yuan
    Cui, Zhaowei
    Liu, Ronggui
    JOURNAL OF MATERIALS IN CIVIL ENGINEERING, 2015, 27 (12)
  • [5] Effect of Different Pre-exposure Loading on Chloride Penetration in Reinforced Concrete Specimens
    Wang, Xiao-Hui
    Zheng, Li
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2019, 17 (7A) : 1075 - 1094
  • [6] Effect of Different Pre-exposure Loading on Chloride Penetration in Reinforced Concrete Specimens
    Xiao-Hui Wang
    Li Zheng
    International Journal of Civil Engineering, 2019, 17 : 1075 - 1094
  • [7] Chloride ion penetration into fly ash modified concrete during wetting-drying cycles
    Simcic, Tina
    Pejovnik, Stane
    De Schutter, Geert
    Bosiljkov, Violeta Bokan
    CONSTRUCTION AND BUILDING MATERIALS, 2015, 93 : 1216 - 1223
  • [8] Study on chloride penetration into flexural cracked reinforced concrete beams subjected to drying-wetting cycles
    Lu, Chunhua
    Liu, Ronggui
    Cui, Zhaowei
    Yan, Yongdong
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2014, 47 (12): : 82 - 90
  • [9] Chloride Penetration in Reinforced Concrete Beams under Combined Sustained Loading and Drying-Wetting Cycles
    Fu, Chuanqing
    Ye, Hailong
    Jin, Nanguo
    Huang, Yanxin
    JOURNAL OF MATERIALS IN CIVIL ENGINEERING, 2020, 32 (04)
  • [10] Modelling chloride penetration in concrete subjected to cyclic wetting and drying
    Arya, Chanakya
    Bioubakhsh, Samira
    Vassie, Perry
    MAGAZINE OF CONCRETE RESEARCH, 2014, 66 (07) : 364 - 376