Design and operation of the air-cooled beam dump for the extraction line of CERN's proton synchrotron booster

被引:4
|
作者
Perillo-Marcone, A. [1 ]
Calviani, M. [1 ]
Solieri, N. [1 ]
Ciccotelli, A. [1 ]
Kaiser, P. [1 ]
Sarrio, A. [1 ]
Venturi, V. [1 ]
Vlachoudis, V. [1 ]
机构
[1] CERN, CH-1211 Geneva 23, Switzerland
来源
关键词
D O I
10.1103/PhysRevAccelBeams.23.063001
中图分类号
O57 [原子核物理学、高能物理学];
学科分类号
070202 ;
摘要
A new beam dump has been designed, built, installed and operated to withstand the future proton beam extracted from the proton synchrotron booster (PSB) in the framework of the LHC Injector Upgrade (LIU) Project at CERN. The future proton beam consists of up to 1 x 10(14) protons per pulse at 2 GeV and is foreseen after the machine upgrades planned for CERN's Long Shutdown 2 (2019-2020). In order to be able to efficiently dissipate the heat deposited by the primary beam, the new dump was designed as a cylindrical block assembly, made out of a copper alloy and cooled by forced airflow. In order to determine the energy density distribution deposited by the beam in the dump, Monte Carlo simulations were performed using the FLUKA code, and thermomechanical analyses were carried out by importing the energy density into ANSYS (R). In addition, computational fluid dynamics (CFD) simulations of the airflow were performed in order to accurately estimate the heat transfer convection coefficient on the surface of the dump. This paper describes the design process, highlights the constraints and challenges of integrating a new dump for increased beam power into the existing facility and provides data on the operation of the dump.
引用
收藏
页数:13
相关论文
共 35 条
  • [1] Design and early operation of a new-generation internal beam dump for CERN's Super Proton Synchrotron
    Francia, A. Romero
    Marcone, A. Perillo
    Pianese, S.
    Andersen, K.
    Izquierdo, G. Arnau
    Briz, J. A.
    Perez, D. Carbajo
    Carlier, E.
    Coiffet, T.
    Esposito, L. S.
    Grenard, J. L.
    Grenier, D.
    Humbert, J.
    Kershaw, K.
    Lendaro, J.
    Rolo, A. Ortega
    Scibor, K.
    Senajova, D.
    Sgobba, S.
    Sharp, C.
    Steyaert, D.
    Velotti, F. M.
    Vincke, H.
    Vlachoudis, V.
    Calviani, M.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2024, 27 (04)
  • [2] The Upgrade of the CERN Proton Synchrotron Booster Transfer Line Magnets
    Newborough, Antony
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2020, 30 (04)
  • [3] Upgrade of the CERN Proton Synchrotron Booster Bending Magnets for 2 GeV Operation
    Newborough, A.
    Buzio, M.
    Chritin, R.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2014, 24 (03)
  • [4] Performance of the CERN Proton Synchrotron internal dump: numerical simulation studies and comparison with beam measurements
    Niang, S.
    Pugnat, T.
    Domange, D.
    Esposito, L. S.
    Giovannozzi, M.
    Gnacadja, E.
    Hernalsteens, C.
    Huschauer, A.
    Tesse, R.
    JOURNAL OF INSTRUMENTATION, 2024, 19 (06):
  • [5] Critique of the design and operation of sustainable air-cooled chillers in commercial buildings
    Yu, F.W.
    Chan, K.T.
    Sit, R.K.Y.
    Yang, J.
    Energy Engineering: Journal of the Association of Energy Engineering, 2015, 112 (03): : 55 - 79
  • [6] Single-muon rate reduction for beam dump operation of the K12 beam line at CERN
    Rosenthal, M.
    Banerjee, D.
    Bernhard, J.
    Brugger, M.
    Charitonidis, N.
    van Dijk, M.
    Doebrich, B.
    Gatignon, L.
    Gerbershagen, A.
    Montbarbon, E.
    Rae, B.
    Spadaro, T.
    INTERNATIONAL JOURNAL OF MODERN PHYSICS A, 2019, 34 (36):
  • [7] Simulation and optimization of beam losses during continuous transfer extraction at the CERN Proton Synchrotron
    Barranco Garcia, Javier
    Gilardoni, Simone
    PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2011, 14 (03):
  • [8] Hot isostatic pressing assisted diffusion bonding for application to the Super Proton Synchrotron internal beam dump at CERN
    Pianese, S.
    Marcone, A. Perillo
    Nuiry, F. -X.
    Calviani, M.
    Szczurek, K. Adam
    Izquierdo, G. Arnau
    Avigni, P.
    Bonnin, S.
    Descarrega, J. Busom
    Feniet, T.
    Kershaw, K.
    Lendaro, J.
    Fontenla, A. Perez
    Schubert, T.
    Sgobba, S.
    Weissgaerber, T.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2021, 24 (04):
  • [9] Improved condenser design and condenser-fan operation for air-cooled chillers
    Yu, FW
    Chan, KT
    APPLIED ENERGY, 2006, 83 (06) : 628 - 648
  • [10] PROCESS CONTROL COMPUTER AT CERN PROTON SYNCHROTRON - ITS APPLICATION IN OPERATION OF A FAST EJECTED BEAM
    VANDERBEKEN, H
    MACHEN, DR
    MADSEN, JHB
    SERRE, C
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1969, NS16 (3P1) : 864 - +