Short-term load forecast using ensemble neuro-fuzzy model

被引:45
|
作者
Malekizadeh, M. [1 ]
Karami, H. [4 ]
Karimi, M. [2 ]
Moshari, A. [2 ]
Sanjari, M. J. [3 ]
机构
[1] Amirkabir Univ Technol, Elect Engn Dept, Tehran, Iran
[2] Niroo Res Inst, Dept Power Syst Planning & Operat, Tehran, Iran
[3] Griffith Univ, Sch Engn & Built Environm, Gold Coast, Qld 4222, Australia
[4] Niroo Res Inst, High Voltage Res Grp, Tehran, Iran
关键词
Short-term load forecasting; Neuro-fuzzy model; LOLIMOT training algorithm; Takagi-Sugeno-Kang model; Flexible network topology; NETWORK; ALGORITHM; ANFIS;
D O I
10.1016/j.energy.2020.117127
中图分类号
O414.1 [热力学];
学科分类号
摘要
In this paper, Takagi-Sugeno-Kang neuro-fuzzy model is trained using locally linear model tree (LOLIMOT) method to forecast day-ahead hourly load profile. The proposed approach is applied to a real load profile measured in Iran as a geographically spread case study. The effects of partitioning the power system to smaller regions on the load forecasting and its advantages, such as practical consideration of daily average temperature data, are also shown. Moreover, a set of preprocessing approaches is proposed and implemented on historical load data to improve forecasting results. It is shown that by using LOLIMOT, the neuro-fuzzy model does not need the predetermined settings, such as the number of neurons, membership functions or fuzzy rules by an expert because all the parameters are set by the LOLIMOT method. This approach leads to the flexible network topology of the trained model for different days, which leads to extract the load profile trends more effectively. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Application of Neuro-Fuzzy models In Short Term Electricity Load Forecast
    Koushki, A. R.
    Maralloo, M. Nosrati
    Lucas, C.
    Kalhor, A.
    2009 14TH INTERNATIONAL COMPUTER CONFERENCE, 2009, : 41 - +
  • [2] Short-term load forecasting by a neuro-fuzzy based approach
    Liang, RH
    Cheng, CC
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2002, 24 (02) : 103 - 111
  • [3] Neuro-fuzzy approaches to short-term electrical load forecasting
    Bartkiewicz, W
    IJCNN 2000: PROCEEDINGS OF THE IEEE-INNS-ENNS INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS, VOL VI, 2000, : 229 - 234
  • [4] Prediction Intervals for Short-Term Load Forecasting Neuro-Fuzzy Models
    Bartkiewicz, Witold
    PRZEGLAD ELEKTROTECHNICZNY, 2012, 88 (10B): : 284 - 287
  • [5] A Novel Short-term Load Forecasting Approach Using Adaptive Neuro-Fuzzy Inference System
    Akarslan, Emre
    Hocaoglu, Fatih Onur
    2018 6TH INTERNATIONAL ISTANBUL SMART GRIDS AND CITIES CONGRESS AND FAIR (ICSG ISTANBUL 2018), 2018, : 160 - 163
  • [6] Automatic fuzzy model identification for short-term load forecast
    Wu, HC
    Lu, CN
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1999, 146 (05) : 477 - 482
  • [7] Short term peak load forecast using detrended partitioned data training of a neuro-fuzzy regression machine
    El-Sharkawi, MA
    Peng, R
    Marks, RJ
    ENGINEERING INTELLIGENT SYSTEMS FOR ELECTRICAL ENGINEERING AND COMMUNICATIONS, 1999, 7 (04): : 197 - 202
  • [8] Short-term building electrical load forecasting using adaptive neuro-fuzzy inference system (ANFIS)
    Ghenai, Chaouki
    Al-Mufti, Omar Ahmed Abduljabbar
    Al-Isawi, Omar Adil Mashkoor
    Amirah, Lutfi Hatem Lutfi
    Merabet, Adel
    JOURNAL OF BUILDING ENGINEERING, 2022, 52
  • [9] Short-term and long-term streamflow forecasting using a wavelet and neuro-fuzzy conjunction model
    Shiri, Jalal
    Kisi, Ozgur
    JOURNAL OF HYDROLOGY, 2010, 394 (3-4) : 486 - 493
  • [10] A neuro-fuzzy approach to short-term load forecasting in a price-sensitive environment
    Khotanzad, A
    Zhou, EW
    Elragal, H
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (04) : 1273 - 1282