An optimal replacement policy for a two-component series system assuming geometric process repair

被引:34
|
作者
Wang, Guan Jun [1 ]
Zhang, Yuan Lin [1 ]
机构
[1] SE Univ, Dept Math, Nanjing 210018, Peoples R China
关键词
series system; geometric process; renewal process; replacement policy (M; N); renewal reward theorem; PROCESS MODEL; MINIMAL REPAIR; GENERAL REPAIR;
D O I
10.1016/j.camwa.2007.01.037
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
This article studies a series repairable system consisting of two non-identical components and one repairer. It is assumed that each component after repair in the system is not "as good as new". Under this assumption, by using a geometric process repair model, a replacement policy (M, N) is considered, based on the number of failures of component 1 and component 2. The problem is to determine,an optimal replacement policy (M*, N*) such that the long-run expected cost per unit time is minimized. The explicit expression for the long-run expected cost per unit time is derived and the corresponding optimal replacement policy can be determined analytically or numerically. Finally, an appropriate numerical example is given to illustrate some theoretical results included the sensitivity. analysis and the uniqueness of the optimal replacement policy (M*, N*). (c) 2007 Published by Elsevier Ltd.
引用
收藏
页码:192 / 202
页数:11
相关论文
共 50 条
  • [1] Policy assuming geometric process repair optimal periodic preventive repair and replacement
    Wang, GJ
    Zhang, YL
    IEEE TRANSACTIONS ON RELIABILITY, 2006, 55 (01) : 118 - 122
  • [2] Optimal replacement policy for a two-component cold standby system with repair priority
    Leung, K. N. F.
    Zhang, Y. L.
    Lai, K. K.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2010, 224 (B6) : 963 - 970
  • [3] Analysis of a two-component series system with a geometric process model
    Lam, Y
    Zhang, YL
    NAVAL RESEARCH LOGISTICS, 1996, 43 (04) : 491 - 502
  • [4] A nearly optimal inspection policy for a two-component series system
    Maaroufi, Ghofrane
    Chelbi, Anis
    Rezg, Nidhal
    Daoud, Ait-Kadi
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2015, 21 (02) : 171 - +
  • [5] A nearly optimal inspection policy for a two-component series system
    Maaroufi, Ghofrane
    Chelbi, Anis
    Rezg, Nidhal
    Ait-Kadi, Daoud
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 956 - 967
  • [6] A geometric process repair model for a two-component system with shock damage interaction
    Wang, Guan Jun
    Zhang, Yuan Lin
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2009, 40 (11) : 1207 - 1215
  • [7] On the optimal allocation of two active redundancies in a two-component series system
    Valdés, JE
    Zequeira, RI
    OPERATIONS RESEARCH LETTERS, 2006, 34 (01) : 49 - 52
  • [8] On the optimal allocation of an active redundancy in a two-component series system
    Valdés, JE
    Zequeira, RI
    STATISTICS & PROBABILITY LETTERS, 2003, 63 (03) : 325 - 332
  • [9] Optimal Replacement Policies for Two-component Parallel System with Stochastic Dependence
    Malki, Zouheir
    Ait-Kadi, Daoud
    Ouali, Mohamed-Salah
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 341 - 345
  • [10] Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions
    Wang, Guan Jun
    Zhang, Yuan Lin
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2016, 47 (05) : 1021 - 1031