NASA's Initial and Sustained Artemis Human Landing Systems

被引:6
|
作者
Watson-Morgan, Lisa [1 ]
Chavers, Greg [1 ]
Connolly, John [2 ]
Crowe, Kathryn [1 ]
Krupp, Don [1 ]
Means, Laura [1 ]
Percy, Thomas [1 ]
Polsgrove, Tara [1 ]
Turpin, Jason [1 ]
机构
[1] NASA, Marshall Space Flight Ctr, 4221 Rideout Rd, Huntsville, AL 35811 USA
[2] NASA, Johnson Space Ctr, 2101 East NASA Pkwy, Houston, TX 77058 USA
来源
2021 IEEE AEROSPACE CONFERENCE (AEROCONF 2021) | 2021年
关键词
D O I
10.1109/AERO50100.2021.9438179
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
On March 26, 2019, in keeping with President Trump's Space Policy Directive-1, Vice President Pence charged NASA with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by 2028. NASA's Human Landing System (HLS) Program is responsible for the final mode of transportation in deep space that will carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA's Artemis lunar exploration program. This paper examines the approach for Artemis human landing systems for both the initial missions and future sustained missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability. The two approaches, however, are not mutually exclusive, as demonstrated by the HLS prime contractors' integrated lander system proposals. On April 30, 2020, NASA announced that Blue Origin of Kent, Washington, Dynetics (a Leidos company) of Huntsville, Alabama, and SpaceX of Hawthorne, California, were the awardees for NASA's Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement. The companies began work in a 10-month base period during which NASA teams worked with the companies to streamline the review of required products and to share the agency's expertise in human spaceflight systems development. Following the base period, NASA will determine which companies will develop the human landers for the initial missions, including the 2024 landing, and which companies will develop landers for future sustained missions toward the end of the decade.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Establishing Trust in NASA's Artemis Campaign Computer-Human Interface (CHI) Implementation
    Salazar, George A.
    2023 IEEE SPACE COMPUTING CONFERENCE, SCC, 2023, : 71 - 79
  • [2] NASA's Human Landing System: The Strategy for the 2024 Mission and Future Sustainability
    Chavers, Greg
    Watson-Morgan, Lisa
    Smith, Marshall
    Suzuki, Nantel
    Polsgrove, Tara
    2020 IEEE AEROSPACE CONFERENCE (AEROCONF 2020), 2020,
  • [3] Artemis: An Overview of NASA's Activities to Return Humans to the Moon
    Creech, Steve
    Guidi, John
    Elburn, Darcy
    2022 IEEE AEROSPACE CONFERENCE (AERO), 2022,
  • [5] Why NASA’s Artemis Moon launch is delayed — and what’s next
    Alexandra Witze
    Nature, 2022, 609 : 664 - 665
  • [6] Why NASA's Artemis Moon launch is delayed - and what's next
    Witze, Alexandra
    NATURE, 2022, 609 (7928) : 664 - 665
  • [7] Acta Non Verba: That should be the motto for NASA's Artemis Accords
    Jah, Moriba
    AEROSPACE AMERICA, 2020, 58 (07) : 64 - +
  • [8] The Artemis Program: An Overview of NASA's Activities to Return Humans to the Moon
    Smith, Marshall
    Craig, Douglas
    Herrmann, Nicole
    Mahoney, Erin
    Krezel, Jonathan
    McIntyre, Nate
    Goodliff, Kandyce
    2020 IEEE AEROSPACE CONFERENCE (AEROCONF 2020), 2020,
  • [9] Design, Development, and Use of a Lunar Lander Simulation for NASA's Artemis Program
    Crues, Edwin Z.
    Gentile, James
    Carothers, Steve
    Whittington, Paige
    Tooher, Katie
    Updegrove, Mark
    2024 IEEE AEROSPACE CONFERENCE, 2024,
  • [10] A Flexible Lunar Architecture for Exploration (FLARE) supporting NASA's Artemis Program
    Evans, Michael E.
    Graham, Lee D.
    ACTA ASTRONAUTICA, 2020, 177 : 351 - 372