Imprecise probabilistic estimation of design floods with epistemic uncertainties

被引:26
|
作者
Qi, Wei [1 ,2 ]
Zhang, Chi [1 ]
Fu, Guangtao [2 ]
Zhou, Huicheng [1 ]
机构
[1] Dalian Univ Technol, Sch Hydraul Engn, Dalian, Peoples R China
[2] Univ Exeter, Coll Engn Math & Phys Sci, Ctr Water Syst, Exeter, Devon, England
基金
中国国家自然科学基金;
关键词
decision making; Dempster-Shafer theory; frequency analysis; hydraulic design; imprecise probability; uncertainty; PARTIAL DURATION SERIES; GOODNESS-OF-FIT; CLIMATE-CHANGE IMPACTS; FREQUENCY-ANALYSIS; DECISION-MAKING; EXTREME-VALUE; MODEL; THRESHOLD; TESTS; STATISTICS;
D O I
10.1002/2015WR017663
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
An imprecise probabilistic framework for design flood estimation is proposed on the basis of the Dempster-Shafer theory to handle different epistemic uncertainties from data, probability distribution functions, and probability distribution parameters. These uncertainties are incorporated in cost-benefit analysis to generate the lower and upper bounds of the total cost for flood control, thus presenting improved information for decision making on design floods. Within the total cost bounds, a new robustness criterion is proposed to select a design flood that can tolerate higher levels of uncertainty. A variance decomposition approach is used to quantify individual and interactive impacts of the uncertainty sources on total cost. Results from three case studies, with 127, 104, and 54 year flood data sets, respectively, show that the imprecise probabilistic approach effectively combines aleatory and epistemic uncertainties from the various sources and provides upper and lower bounds of the total cost. Between the total cost and the robustness of design floods, a clear trade-off which is beyond the information that can be provided by the conventional minimum cost criterion is identified. The interactions among data, distributions, and parameters have a much higher contribution than parameters to the estimate of the total cost. It is found that the contributions of the various uncertainty sources and their interactions vary with different flood magnitude, but remain roughly the same with different return periods. This study demonstrates that the proposed methodology can effectively incorporate epistemic uncertainties in cost-benefit analysis of design floods.
引用
收藏
页码:4823 / 4844
页数:22
相关论文
共 50 条
  • [1] Alternative metrics for design decisions based on separating aleatory and epistemic probabilistic uncertainties
    Hickey, John
    Langley, Robin
    Mechanical Systems and Signal Processing, 2022, 181
  • [2] Alternative metrics for design decisions based on separating aleatory and epistemic probabilistic uncertainties
    Hickey, John
    Langley, Robin
    MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2022, 181
  • [3] Handling epistemic and aleatory uncertainties in probabilistic circuits
    Federico Cerutti
    Lance M. Kaplan
    Angelika Kimmig
    Murat Şensoy
    Machine Learning, 2022, 111 : 1259 - 1301
  • [4] On the separation of aleatory and epistemic uncertainties in probabilistic assessments
    Jyrkama, Mikko I.
    Pandey, Mahesh D.
    NUCLEAR ENGINEERING AND DESIGN, 2016, 303 : 68 - 74
  • [5] Handling epistemic and aleatory uncertainties in probabilistic circuits
    Cerutti, Federico
    Kaplan, Lance M.
    Kimmig, Angelika
    Sensoy, Murat
    MACHINE LEARNING, 2022, 111 (04) : 1259 - 1301
  • [6] Bayesian probabilistic propagation of imprecise probabilities with large epistemic uncertainty
    Wei, Pengfei
    Liu, Fuchao
    Valdebenito, Marcos
    Beer, Michael
    MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2021, 149
  • [7] Design Floods Considering the Epistemic Uncertainty
    Drobot, Radu
    Draghia, Aurelian Florentin
    Ciuiu, Daniel
    Trandafir, Romica
    WATER, 2021, 13 (11)
  • [8] PROBABILISTIC ASSESSMENT OF EXTREME EVENTS SUBJECT TO EPISTEMIC UNCERTAINTIES
    Nishijima, Kazuyoshi
    Faber, Michael Havbro
    Maes, Marc A.
    OMAE 2008: PROCEEDINGS OF THE 27TH INTERNATIONAL CONFERENCE ON OFFSHORE MECHANICS AND ARCTIC ENGINEERING - 2008, VOL 2, 2008, : 175 - 183
  • [9] Quantification of epistemic uncertainties in probabilistic seismic hazard analysis
    Scherbaum, F.
    Kuehn, N.
    Ohrnberger, M.
    Riggelsen, C.
    Gianniotis, N.
    APPLICATIONS OF STATISTICS AND PROBABILITY IN CIVIL ENGINEERING, 2011, : 768 - 775
  • [10] Imprecise Epistemic Values and Imprecise Credences
    Levinstein, B. A.
    AUSTRALASIAN JOURNAL OF PHILOSOPHY, 2019, 97 (04) : 741 - 760