Study on digital DC hoist system of mine-shaft

被引:0
|
作者
Li Qixuan [1 ]
Sun Huoran [1 ]
Mu Taisheng [1 ]
Wang Bo [1 ]
机构
[1] Northeastern Univ, Sch Resources & Civil Engn, Shenyang 110004, Peoples R China
关键词
winding type winch; friction hoist; variable flow control; frequency-variation control; PLC;
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
This paper summarizes the study on the current situation of the elevating equipment and the principle, prospect and control method of digital control system in China and abroad. On the basis of the research, this paper develops a DC hoist system of mine-shaft, which has characteristics of high security, more stability, accurate control and convenient maintenance. The application of this system will enhance the efficiency of the elevating in the mine industry, improve the operating environment, reduce the energy consumption, increase the economic profit of the mine industry and improve the level of the management.
引用
收藏
页码:894 / 898
页数:5
相关论文
共 50 条
  • [1] Digital DC Speed Control System in Mine Hoist Application
    He, Rui
    Ge, Yunping
    ADVANCED RESEARCH ON INFORMATION SCIENCE, AUTOMATION AND MATERIAL SYSTEM, PTS 1-6, 2011, 219-220 : 1017 - 1021
  • [2] Mine-shaft conveyance monitoring
    Beus, MJ
    Ruff, TM
    Iverson, S
    McCoy, WG
    MINING ENGINEERING, 2000, 52 (10) : 55 - 58
  • [3] Application of the geological information system in the mine-shaft production dispatching
    Li, Gang
    Zhang, Guoliang
    Qidong Shiyan yu Celiang Kongzhi/Aerodynamic Experiment and Measurement & Control, 12 (01): : 1 - 3
  • [4] The Improvement of the Bunton Construction of Mine-shaft Equipment
    Kopytov, Aleksandr, I
    Pershin, Vladimir V.
    Voitov, Michail D.
    Wetti, Ahmed A.
    PROCEEDINGS OF THE 8TH RUSSIAN-CHINESE SYMPOSIUM COAL IN THE 21ST CENTURY: MINING, PROCESSING, SAFETY, 2016, 92 : 108 - 110
  • [5] Prevention of Mine-Shaft Failure by Aquifer Replenishment
    Liu, S. -Q.
    Jie, Y. -X.
    Xu, Y. -C.
    JOURNAL OF TESTING AND EVALUATION, 2017, 45 (03) : 890 - 903
  • [6] MINE-SHAFT ROPES - CONSTRUCTION, LUBRICATION AND MAINTENANCE
    NAUD, R
    LUBRICATION ENGINEERING, 1980, 36 (05): : 270 - 276
  • [7] Fault detection and diagnosis of mine-shaft hoists
    Lu, Yan
    Jinshu Kuangshan/Metal Mine, (03): : 32 - 33
  • [8] Automatic system of digital measuring mine hoist
    Zhang Jiancheng
    Zhang Qingxia
    Zhang Fusheng
    Liu Jianhua
    Proceedings of the First International Symposium on Test Automation & Instrumentation, Vols 1 - 3, 2006, : 1553 - 1556
  • [9] Development of electrical primary mine-shaft hauling engines
    Philippi, W
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1936, 80 : 446 - 448
  • [10] A digital technology based monitoring system for mine hoist
    Liu, X
    Jiang, JG
    Zuo, DS
    Mining Science and Technology, 2004, : 861 - 865