Cast-in-place segmental bridges for transportation projects

被引:0
|
作者
Rodriguez, Santiago [1 ]
机构
[1] TY Lin Int, Alexandria, VA USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Long span concrete box girder bridges first appeared in the 1950's. From the beginning, this bridge type was built segmentally using the balanced cantilever method of construction with form travelers and cast-in-place segments. After half a century of developments, concrete box girder bridges have a positive track record, are widely used, and have reached spans of up to 988 ft. These bridges present specific challenges to the designer that have to be addressed in the context of design codes, available materials, prevailing construction methods and project constraints. This paper describes current design trends for cross-section design, post tensioning layout and superstructure articulation. It also discusses the opportunities provided by high strength and lightweight concrete, and the impact of the new AASHTO LRFD code. The design of the Kanawha River Bridge in West Virginia is used to illustrate these topics. This river crossing, recently designed by T.Y. Lin International, will have a 760-foot main span, the longest concrete box girder span in the United States, and a total length of 2,975 ft.
引用
收藏
页码:59 / 66
页数:8
相关论文
共 50 条
  • [1] ANALYSIS OF CAST-IN-PLACE CONCRETE SEGMENTAL CANTILEVER BRIDGES
    BISHARA, AG
    PAPAKONSTANTINOU, NG
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1990, 116 (05): : 1247 - 1268
  • [2] Design & construction of cast-in-place segmental concrete bridges for the Bangkok Transit System
    Dietrick, J
    Dodson, B
    15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 381 - 387
  • [3] Design & construction of cast-in-place segmental concrete bridges for the Bangkok transit system
    Dietrick, J
    Dodson, B
    15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 381 - 387
  • [4] Cold-weather cast-in-place segmental construction for long-span bridges
    Burgess, CJ
    CONSTRUCTION 2000: MATERIALS AND CONSTRUCTION, 2000, (1712): : 157 - 163
  • [5] CAST-IN-PLACE POST-TENSIONED BRIDGES
    LIBBY, JR
    CIVIL ENGINEERING, 1971, 41 (08): : 38 - &
  • [6] Use of cast-in-place piles in the Angara construction projects
    Yurko, Yu.P.
    Soil Mechanics and Foundation Engineering, 1988, 25 (03) : 91 - 96
  • [7] Research on Quasi-Static Test for Cast-in-Place UHPC Joints in Precast Segmental Pier and Heights of Cast-in-Place Joints
    Zheng, Gang
    Chen, Liujian
    Gao, Liqiang
    Bridge Construction, 2024, 54 (06) : 56 - 63
  • [8] Evaluation of Cast-in-Place Splice Regions of Spliced I-Girder Bridges
    Williams, C. S.
    Moore, A. M.
    Al-Tarafany, D.
    Massey, J. B.
    Bayrak, O.
    Jirsa, J. O.
    Ghannoum, W. M.
    ACI STRUCTURAL JOURNAL, 2019, 116 (06) : 181 - 193
  • [9] INSPECTING CAST-IN-PLACE CONCRETE
    MCDONALD, TB
    ARCHITECTURE-THE AIA JOURNAL, 1988, 77 (06): : 125 - 126
  • [10] Strain Analysis on Cast-In-Place Balanced Cantilever Prestressed Concrete Bridges During Construction
    Jurisic, Marino
    Bebek, Neda
    Cubela, Dragan
    Harapin, Alen
    STRUCTURAL ENGINEERING INTERNATIONAL, 2024, 34 (04) : 621 - 631