A two-dimensional preventive maintenance strategy for items sold with warranty

被引:54
|
作者
Wang, Xiaolin [1 ]
Su, Chun [1 ,2 ]
机构
[1] Southeast Univ, Sch Mech Engn, Dept Ind Engn, Nanjing, Jiangsu, Peoples R China
[2] Jiangsu Wind Power Engn Technol Ctr, Nanjing, Jiangsu, Peoples R China
关键词
two-dimensional warranty; preventive maintenance; age reduction; warranty cost analysis; optimisation; REPAIR-REPLACE STRATEGY; OPTIMAL BURN-IN; EXTENDED WARRANTY; PRODUCT WARRANTY; USAGE RATE; POLICIES; MODEL; SYSTEMS; CONTRACTS;
D O I
10.1080/00207543.2016.1187314
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Conventional preventive maintenance (PM) strategies under two-dimensional (2D) warranties are usually age-based or usage-based, which means that the implementation of PM activities is based solely on item age or usage. In this paper, a new PM strategy, called 2D PM strategy, is proposed for items sold with a 2D warranty. Under this strategy, the item is preventively maintained every K units of age or L units of usage, whichever occurs first. The marginal approach is used to describe the effect of age and usage on item reliability by treating usage as a random function of age. Besides, the effect of PM is characterised by the reduction of virtual age. The objective of this study is to identify the optimal 2D PM strategy under fixed warranty terms so as to minimise the total expected warranty servicing cost from the manufacturer's perspective. A numerical example is provided to demonstrate the effectiveness of the proposed PM strategy. It is shown that the 2D PM strategy contains the age-based and usage-based strategies as special cases, and outperforms them in terms of warranty servicing cost. Finally, how to implement the proposed PM strategy in practice is discussed with an illustrative case.
引用
收藏
页码:5901 / 5915
页数:15
相关论文
共 50 条
  • [1] Optimal preventive maintenance strategy for repairable items under two-dimensional warranty
    Wang, Yukun
    Liu, Zixian
    Liu, Yiliu
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 142 : 326 - 333
  • [2] A new preventive maintenance strategy for items sold under warranty
    Jack, N.
    Murthy, D.N.P.
    IMA Journal of Management Mathematics, 2002, 13 (02) : 121 - 129
  • [3] Customized Preventive Maintenance Strategies for Products Sold with Two-Dimensional Warranty
    Dong, Fangqi
    Wang, Huaqiang
    Men, Feng
    Liang, Lijun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021 (2021)
  • [4] A new repair-replace strategy for items sold with a two-dimensional warranty
    Iskandar, BP
    Murthy, DNP
    Jack, N
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (03) : 669 - 682
  • [5] Two-dimensional preventive maintenance optimum for equipment sold with availability-based warranty
    Su, Chun
    Cheng, Longfei
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2019, 233 (04) : 648 - 657
  • [6] Service Contract with Periodic Preventive Maintenance for a Dump Truck Sold with a Two-Dimensional Warranty
    Nasrum, A.
    Pasaribu, U. S.
    Husniah, H.
    APPLICATION OF MATHEMATICS IN INDUSTRY AND LIFE, 2016, 1716
  • [7] Optimization of joint preventive maintenance strategy for two-dimensional warranty equipment
    Dong, Enzhi
    Wang, Rongcai
    Wang, Qian
    Cheng, Zhonghua
    AIP ADVANCES, 2024, 14 (07)
  • [8] A repair-replace strategy based on usage rate for items sold with a two-dimensional warranty
    Jack, N.
    Iskandar, B. P.
    Murthy, D. N. P.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2009, 94 (02) : 611 - 617
  • [9] Optimal burn-in for repairable products sold with two-dimensional warranty considering preventive maintenance
    Li, X. P.
    Liu, Z. X.
    Wang, Y. K.
    Liu, Y. L.
    SAFETY AND RELIABILITY - SAFE SOCIETIES IN A CHANGING WORLD, 2018, : 623 - 631
  • [10] PREVENTIVE MAINTENANCE STRATEGY OPTIMIZING MODEL UNDER TWO-DIMENSIONAL WARRANTY POLICY
    Cheng, Zhong Hua
    Yang, Zhi Yuan
    Zhao, Jian Min
    Bin Wang, Ya
    Li, Zhi Wei
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (03): : 365 - 373