Hybrid neurofuzzy wind power forecast and wind turbine location for embedded generation

被引:16
|
作者
Adedeji, Paul A. [1 ]
Akinlabi, Stephen A. [2 ]
Madushele, Nkosinathi [1 ]
Olatunji, Obafemi O. [1 ]
机构
[1] Univ Johannesburg, Dept Mech Engn Sci, Johannesburg, South Africa
[2] Walter Sisulu Univ, Dept Mech Engn, Mthatha, South Africa
关键词
ANFIS; embedded generation; genetic algorithm; particle swarm optimization; single facility location; South Africa; utility-scale wind turbine; wind energy; FACILITY LOCATION; PERFORMANCE EVALUATION; GENETIC ALGORITHM; FUZZY; ALLOCATION; SYSTEM; ANFIS; PSO; GA; FARMS;
D O I
10.1002/er.5620
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Wind energy uptake in South Africa is significantly increasing both at the micro- and macro-level and the possibility of embedded generation cannot be undermined considering the state of electricity supply in the country. This study identifies a wind hotspot site in the Eastern Cape province, performs an in silico deployment of three utility-scale wind turbines of 60 m hub height each from different manufacturers, develops machine learning models to forecast very short-term power production of the three wind turbine generators (WTG) and investigates the feasibility of embedded generation for a potential livestock industry in the area. Windographer software was used to characterize and simulate the net output power from these turbines using the wind speed of the potential site. Two hybrid models of adaptive neurofuzzy inference system (ANFIS) comprising genetic algorithm and particle swarm optimization (PSO) each for a turbine were developed to forecast very short-term power output. The feasibility of embedded generation for typical medium-scale agricultural industry was investigated using a weighted Weber facility location model. The analytical hierarchical process (AHP) was used for weight determination. From our findings, the WTG-1 was selected based on its error performance metrics (root mean square error of 0.180, mean absolute SD of 0.091 and coefficient of determination of 0.914 and CT = 702.3 seconds) in the optimal model (PSO-ANFIS). Criteria were ranked based on their order of significance to the agricultural industry as proximity to water supply, labour availability, power supply and road network. Also, as a proof of concept, the optimal location of the industrial facility relative to other criteria wasX= 19.24 m,Y= 47.11 m. This study reveals the significance of resource forecasting and feasibility of embedded generation, thus improving the quality of preliminary resource assessment and facility location among site developers.
引用
收藏
页码:413 / 428
页数:16
相关论文
共 50 条
  • [1] Hybrid power systems with diesel and wind turbine generation
    Bialasiewicz, JT
    Muljadi, E
    Drouilhet, S
    Nix, G
    PROCEEDINGS OF THE 1998 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 1998, : 1705 - 1709
  • [2] A new hybrid method to forecast wind turbine output power in power systems
    Soleymani, Soodabeh
    Mohammadi, Sirus
    Rezayi, Hamid-Reza
    Moghimai, Rohalla
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 28 (04) : 1503 - 1508
  • [3] Power Generation Forecast of Hybrid PV-Wind System
    Sanjari, Mohammad Javad
    Gooi, Hoay Beng
    Nair, Nirmal-Kumar C.
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2020, 11 (02) : 703 - 712
  • [4] Hybrid Power Transmission Technology in a Wind Turbine Generation System
    Lin, Yonggang
    Tu, Le
    Liu, Hongwei
    Li, Wei
    IEEE-ASME TRANSACTIONS ON MECHATRONICS, 2015, 20 (03) : 1218 - 1225
  • [5] Effect of wind veer on wind turbine power generation
    Gao, Linyue
    Li, Bochen
    Hong, Jiarong
    PHYSICS OF FLUIDS, 2021, 33 (01)
  • [6] A Novel Wind Power Forecast Model: Statistical Hybrid Wind Power Forecast Technique (SHWIP)
    Ozkan, Mehmet Baris
    Karagoz, Pinar
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2015, 11 (02) : 375 - 387
  • [7] Hybrid mathematical model of wind turbine for assessment of wind generation impact on transients in power systems
    Razzhivin, Igor
    Suvorov, Aleksey
    Kievets, Anton
    Askarov, Alisher
    EEA - Electrotehnica, Electronica, Automatica, 2019, 67 (04): : 28 - 34
  • [8] Maintenance of Wind Turbine Scheduling Based on Output Power Data and Wind Forecast
    D'Amico, Guglielmo
    Petroni, Filippo
    Sobolewski, Robert Adam
    ADVANCES IN DEPENDABILITY ENGINEERING OF COMPLEX SYSTEMS, 2018, 582 : 106 - 117
  • [9] Implications of wind power generation: exposure to wind turbine noise
    Arezes, Pedro M.
    Bernardo, C. A.
    Ribeiro, Estefania
    Dias, Hernani
    2ND WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT, 2014, 109 : 390 - 395
  • [10] Wind turbine concepts for domestic wind power generation at low wind quality sites
    Wilberforce, Tabbi
    Olabi, A. G.
    Sayed, Enas Taha
    Alalmi, Abdul Hai
    Abdelkareem, Mohammad Ali
    JOURNAL OF CLEANER PRODUCTION, 2023, 394