Optimal method for changing the number of kanbans in the e-Kanban system and its applications

被引:22
|
作者
Kotani, S. [1 ]
机构
[1] Tokyo Metropolitan Univ, Sch Business Adm, Fac Urban Liberal Arts, Tokyo 1920397, Japan
关键词
Just-in-Time production system; Toyota production system; kanban system; e-Kanban system; number of kanbans; changing the number of kanbans;
D O I
10.1080/00207540601096940
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Toyota Motor Corporation has recently developed a new kanban system called 'e-Kanban', which is a parts ordering information system that operates within the communications network established between Toyota and its suppliers. One of the goals for developing the e-Kanban system was to introduce an efficient means for properly changing the number of kanbans once the required number has been calculated, as changing the number of kanbans in the kanban system directly affects the order quantity. Consequently, it is very important to monitor carefully and control changes in the number of kanbans. The paper investigates and proposes an effective method for changing the number of kanbans using the e-Kanban system. Applying this method to three problems, it is shown that the e-Kanban system can be implemented more efficiently and effectively than the original kanban system.
引用
收藏
页码:5789 / 5809
页数:21
相关论文
共 50 条
  • [1] An E-kanban System for Fork Truck Assembly Lines
    Hu, Rong
    Gao, Fei
    Gong, Cheng
    ADVANCES IN MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 220-223 : 259 - +
  • [2] ONLINE E-KANBAN SYSTEM IMPLEMENTATION IN A MANUFACTURING COMPANY
    Trebuna, P.
    Pekarcikova, M.
    Kliment, M.
    Kopec, J.
    Svantner, T.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2023, 22 (01) : 5 - 16
  • [3] MATERIAL FLOW OPTIMIZATION THROUGH E-KANBAN SYSTEM SIMULATION
    Pekarcikova, M.
    Trebuna, P.
    Kliment, M.
    Rosocha, L.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (02) : 243 - 254
  • [4] Determination of the optimal number of kanbans and kanban allocation in a FMS: a simulation-based study
    Sengupta, S
    Sharief, F
    Dutta, SP
    PRODUCTION PLANNING & CONTROL, 1999, 10 (05) : 439 - 447
  • [5] Using tabu search to determine the number of kanbans and lotsizes in a generic kanban system
    Andrew D. Martin
    Te-Min Chang
    Yeuhwern Yih
    Rex K. Kincaid
    Annals of Operations Research, 1998, 78 : 201 - 217
  • [6] Using tabu search to determine the number of kanbans and lotsizes in a generic kanban system
    Martin, AD
    Chang, TM
    Yih, Y
    Kincaid, RK
    ANNALS OF OPERATIONS RESEARCH, 1998, 78 (0) : 201 - 217
  • [7] DETERMINING THE NUMBER OF KANBANS AND LOTSIZES IN A GENERIC KANBAN SYSTEM - A SIMULATED ANNEALING APPROACH
    CHANG, TM
    YIH, Y
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) : 1991 - 2004
  • [9] THE DETERMINATION OF THE OPTIMAL NUMBER OF KANBANS IN A JUST-IN-TIME PRODUCTION SYSTEM
    FUKUKAWA, T
    HONG, SC
    COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 24 (04) : 551 - 559
  • [10] Optimization of Inbound Logistics by Implementing E-Kanban System in an Automobile Accessories Manufacturing Unit - A Case Study
    Rao, Koteshwara G.
    Kenneth Michael, Lidwin
    Sriram, K. V.
    QUALITY-ACCESS TO SUCCESS, 2019, 20 (170): : 106 - 111