Complexity of the job insertion problem in multi-stage scheduling

被引:1
|
作者
Vestjens, Arjen P. A.
Wennink, Marc
Woeginger, Gerhard J.
机构
[1] TU Eindhoven, Dept Math & Comp Sci, NL-5600 MB Eindhoven, Netherlands
[2] Ctr Quantitat Methods CQM BV, NL-5600 AK Eindhoven, Netherlands
关键词
scheduling; computational complexity;
D O I
10.1016/j.orl.2007.02.004
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The job insertion problem in multi-stage scheduling is: given a schedule for n jobs and an additional job, find a feasible insertion of the additional job into the schedule that minimizes the resulting makespan. We prove that finding the optimal job insertion is NP-hard for flow shops and open shops. (C) 2007 Published by Elsevier B.V.
引用
收藏
页码:754 / 758
页数:5
相关论文
共 50 条
  • [1] A Multi-stage Simulated Annealing Algorithm for the Torpedo Scheduling Problem
    Kletzander, Lucas
    Musliu, Nysret
    INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING, CPAIOR 2017, 2017, 10335 : 344 - 358
  • [2] Application of multi-stage scheduling
    Bongers, Peter M. M.
    Bakker, B. H.
    16TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING AND 9TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2006, 21 : 1917 - 1922
  • [3] Real-time scheduling of multi-stage flexible job shop floor
    Ham, Myoungsoo
    Lee, Young Hoon
    Kim, Sun Hoon
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (12) : 3715 - 3730
  • [4] Multi-stage ordinal optimization based approach for job shop scheduling problems
    Horng, Shih-Cheng
    Lin, Shin-Yeu
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 219 (03) : 1125 - 1134
  • [5] On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties
    Lauff, V
    Werner, F
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (03) : 317 - 345
  • [6] Method for multi-stage alternative grouping parallel machines scheduling problem
    Miao, Feng
    Xie, An-Huan
    Wang, Fu-An
    Yu, Feng
    Zhou, Hua
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2015, 49 (05): : 866 - 872
  • [7] Solution strategies for multi-stage wafer probing scheduling problem with reentry
    Pearn, W. L.
    Chung, S. H.
    Yang, M. H.
    Shiao, K. P.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2008, 59 (05) : 637 - 651
  • [8] Economic lot and delivery scheduling problem for multi-stage supply chains
    Osman, Hany
    Demirli, Kudret
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 136 (02) : 275 - 286
  • [9] A study of the multi-stage flowshop scheduling problem with alternative operation assignments
    Futatsuishi, Y
    Watanabe, I
    Nakanishi, T
    MATHEMATICS AND COMPUTERS IN SIMULATION, 2002, 59 (1-3) : 73 - 79
  • [10] INSERTION ALGORITHMS TO SOLVE THE RESOURCE-CONSTRAINED MULTI-STAGE PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOW MAXIMIZATION
    Klimek, Marcin
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2018, 9 (04) : 106 - 116