Using risk to balance agile and plan-driven methods

被引:177
作者
Boehm, B [1 ]
Turner, R
机构
[1] Univ So Calif, Ctr Software Engn, Los Angeles, CA 90089 USA
[2] George Washington Univ, Engn Management & Syst Engn Fac, Washington, DC USA
关键词
D O I
10.1109/MC.2003.1204376
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Both agile and plan-driven approaches have situation-dependent shortcomings that, if not addressed, can lead to project failure. The challenge is to balance the two approaches to take advantage of their strengths in a given situation while compensating for their weaknesses. The authors present a risk-based approach for structuring projects to incorporate both agile and plan-driven approaches in proportion to a project's needs.
引用
收藏
页码:57 / +
页数:11
相关论文
共 13 条
[1]  
ANTHES G, 2003, COMPUTERWORLD 0127, P26
[2]   Anchoring the software process [J].
Boehm, B .
IEEE SOFTWARE, 1996, 13 (04) :73-&
[3]  
Boehm B, 2003, BALANCING AGILITY DI
[4]  
BOEHM B, 2001, CROSSTALK MAY, P4
[5]  
BOEHM B, 2001, CROSSTALK DEC, P23
[6]  
Cockburn A., 2002, AGILE SOFTWARE DEV, V177
[7]  
Elssamadisy A, 2002, ICSE 2002: PROCEEDINGS OF THE 24TH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING, P617, DOI 10.1109/ICSE.2002.1008006
[8]  
Jacobson I., 1999, AW OBJ TECHNOL S, V1
[9]  
MANZO J, 2003, P USC CSE AG METH WO
[10]  
MANZO J, 2002, CROSSTALK OCT, P30