共 50 条
- [3] The risk assessment model of TOT concession period based on Time Fuzzy Petri Net PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 1328 - 1333
- [9] RISK ASSESSMENT OF RISER OPERATIONS ON DP DRILLING UNITS PROCEEDINGS OF THE ASME 29TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING 2010, VOL 2, 2010, : 823 - 829