Exploring the Moral Hazard Evolutionary Mechanism for BIM Implementation in an Integrated Project Team

被引:17
|
作者
Du, Yanchao [1 ]
Zhou, Hengyu [1 ]
Yuan, Yongbo [1 ]
Xue, Hong [2 ]
机构
[1] Dalian Univ Technol, Dept Construct Management, Dalian 116024, Peoples R China
[2] Harbin Inst Technol, Sch Management, Harbin 150001, Heilongjiang, Peoples R China
关键词
integrated project delivery; building information modeling; moral hazard behavior; evolutionary game model; INSTITUTIONAL ECONOMICS; CONSTRUCTION PROJECTS; INCENTIVE MECHANISM; DESIGN; GAME; PERFORMANCE; INFORMATION; DIFFUSION; MODEL; IPD;
D O I
10.3390/su11205719
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Integrated project delivery (IPD) is a new emerging delivery system, contributes to increase value to the owner, reduces waste and maximizes efficiency in the life cycle of projects. However, IPD system has not yet shifted from pilot-alike or particular-purposed cases to large-scale applications. The huge advantages of building information modeling (BIM) are far from being exploited, which directly leads to the delivered outcomes below expectations, thereby causing obstacles to widespread application of IPD system. The reasons impeding the successful application of BIM has been a hot topic. Previous studies suggested that moral hazard behavior is a critical inducer leading to the undesirable outcomes. However, very few studies have studied the evolution mechanism of moral hazard behavior for BIM application. To fill this knowledge gap, this study proposed a novel model, aiming to capture dynamically the interactive behavior of BIM-based strategy selections using evolutionary game theory. Five parameters of monitoring cost, proprietary cost, incentive payment, punishment and speculative benefit are extracted and defined in the proposed model. Numerical simulations are conducted with MATLAB 2016a. The simulation results showed that when incentive payment is higher than the sum of speculative benefit and proprietary cost, interactive behavior of both game players will move toward the optimal portfolio strategy. Incentive payment and punishment have negative correlations with the probability of moral hazard behavior for BIM application. Parameters of speculative benefit and proprietary cost affect positively implementation probability of moral hazard behavior of employing BIM. This study can provide theoretical and managerial implications for integrated project managers and related government department to improve implementation of BIM and IPD system, and also contribute to its sustainable development.
引用
收藏
页数:28
相关论文
共 9 条
  • [1] Linking BIM Definition, BIM Capability Maturity, and Integrated Project Delivery in the AECO Industry: The Influences of BIM Diffusion and Moral Hazard
    Wang, Ting
    Feng, Jingchun
    JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2022, 148 (03)
  • [2] Organization of Project Evaluation and Implementation under Moral Hazard
    Jost, Peter-J.
    Lammers, Frauke
    JOURNAL OF INSTITUTIONAL AND THEORETICAL ECONOMICS-ZEITSCHRIFT FUR DIE GESAMTE STAATSWISSENSCHAFT, 2010, 166 (02): : 212 - 238
  • [3] Explore Knowledge-Sharing Strategy and Evolutionary Mechanism for Integrated Project Team Based on Evolutionary Game Model
    Du, Yanchao
    Zhou, Hengyu
    Yuan, Yongbo
    Liu, Xiaoxue
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [4] Benefit sharing for BIM implementation: Tackling the moral hazard dilemma in inter-firm cooperation
    Zheng, Linzi
    Lu, Weisheng
    Chen, Ke
    Chau, Kwong Wing
    Niu, Yuhan
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (03) : 393 - 405
  • [5] Implementation outcomes of humanwide: A pilot project of integrated precision health in team-based primary care
    Brown-Johnson, Cati
    Safaeinili, Nadia
    Baratta, Juliana
    Morris, Sarah
    Palaniappan, Latha
    Mahoney, Megan
    Rosas, Lisa
    Winget, Marcy
    IMPLEMENTATION SCIENCE, 2020, 15
  • [6] Balanced and integrated e-government implementation - exploring the crossroad of public policy-making and information systems project management processes
    Melin, Ulf
    Wihlborg, Elin
    TRANSFORMING GOVERNMENT- PEOPLE PROCESS AND POLICY, 2018, 12 (02) : 191 - 208
  • [7] Construction and Implementation of Team Task Mechanism for Software Engineering Courses Empowered by AI and Collaborative Competition——A Case Study of Software Project Management Course
    Jun Guo
    Yixian Liu
    Xiaochun Yang
    Dongming Chen
    Zhiliang Zhu
    计算机教育, 2025, (03) : 48 - 54
  • [8] Design and implementation of an inter-institutional pilot project for the socio-sanitary-educational integration of children with complex chronic diseases and other special needs (EVAI: Integrated care assessment team)
    Munoz Garcia, Gisela
    Sanchez Martinez de Luna, Maria del Mar
    Eskubi Goienetxe, Izaskun
    Arrieta Echeita, Goizalde
    Perez Fernandez, Jose Luis
    Landaluce Lauzurica, Jose Ignacio
    Lopez Aguayo, Mercedes
    Bilbao Bilbao, Itziar
    Ayuso Gallardo, Almudena
    Vazquez Ingelmo, Montserrat
    Herran, Sara
    Munoz Cano, Ramon
    Gallo Fernandez, Inaki
    INTERNATIONAL JOURNAL OF INTEGRATED CARE, 2019, 19
  • [9] Unveiling amoxicillin photocatalytic decontamination utilizing CuFe2O4/CuS core-shell heterostructure-integrated peroxymonosulfate activation: Mechanism insights, aquatic hazard assessment, and environmental implementation
    Lei, Chao
    Ye, Mingli
    Tang, Jun
    Yu, Cun
    Yu, Sha
    JOURNAL OF WATER PROCESS ENGINEERING, 2024, 67