Innovations in Design, Construction, and Management of Pingnan Third Bridge - The Largest-Span Arch Bridge in the World

被引:29
|
作者
Zheng, Jielian [1 ]
Du, Hailong [2 ]
Mu, Tingmin [3 ]
Liu, Jiaping [4 ]
Qin, Dayan [2 ]
Mei, Guoxiong [1 ]
Tu, Bing [1 ]
机构
[1] Guangxi Univ, Coll Civil Engn & Architecture, Nanning, Peoples R China
[2] Guangxi Rd & Bridge Engn Grp Co Ltd, Nanning, Peoples R China
[3] Sichuan Highway Planning Survey Design & Res Inst, Chengdu, Peoples R China
[4] Southeast Univ, Coll Mat Sci & Engn, Jiangsu Key Lab Construct Mat, Nanjing, Peoples R China
基金
中国国家自然科学基金;
关键词
Pingnan Third Bridge; concrete-filled steel tubular (CFST) arch bridge; independent cantilever unit; active force control and displacement adjustment technology; timed expansion and shrinkage compensation technology; diaphragm wall encapsulating grouting-reinforced pebble layer;
D O I
10.1080/10168664.2021.1956399
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The main bridge of Pingnan Third Bridge is a half-through concrete-filled steel tubular (CFST) arch bridge with a span of 575 m, and it is the largest-span arch bridge worldwide. Several innovative technologies were proposed and adopted with respect to the design, construction and management of Pingnan Third Bridge, including: (1) integrated design and prefabricated construction technologies based on the independent cantilever unit concept to accelerate the assembly of the steel truss for the main arch; (2) a BeiDou Navigation Satellite System (BDS) based active force control and displacement adjustment technology for the construction tower and a force optimization model for the one-time tensioning of buckled cables; (3) the vacuum-assisted filling technique integrated with an advanced timed expansion and shrinkage compensation technology that generally solved the historically stubborn defect of in-tube concrete de-bonding and voiding in the CFST arch bridge industry; (4) a novel composite bridge foundation of the diaphragm wall encapsulating a grouting-reinforced pebble layer for the northern abutment of the Pingnan Third Bridge; and (5) a new management paradigm integrating informatization and intelligent technology to promote the construction management efficiency of the large-span bridge. These proposed innovative technologies can serve as good references for the construction of similar large bridges in the future.
引用
收藏
页码:134 / 141
页数:8
相关论文
共 50 条
  • [1] The largest arch bridge in the world in one span width
    不详
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1924, 68 : 674 - 674
  • [2] Life-cycle based structural performance of long-span CFST hybrid arch bridge: A study on arch of Pingnan Third Bridge
    Chen, Bo-Wen
    Han, Lin-Hai
    Qin, Da-Yan
    Li, Wei
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2023, 207
  • [3] Innovations in concrete arch bridge design
    Radic, J.
    Savor, Z.
    Kindij, A.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2006, 159 (03) : 121 - 126
  • [4] Mingzhuwan Bridge: The Largest Span Three-Main-Truss Steel Arch Bridge
    Shangguan, Bing
    Hu, Huiyong
    Ning, Pinghua
    Su, Qingtian
    STRUCTURAL ENGINEERING INTERNATIONAL, 2023, 33 (01) : 89 - 95
  • [5] Dashengguan Bridge-The Largest Span Steel Arch Bridge for High-Speed Railway
    Gao, Zongyu
    Vi, Lunxiong
    Xiao, Hai Zhu
    STRUCTURAL ENGINEERING INTERNATIONAL, 2010, 20 (03) : 299 - 302
  • [6] CONSTRUCTION AND RELATED DESIGN ASPECTS OF A LARGE SPAN CONCRETE ARCH BRIDGE.
    Liebenberg, A.C.
    Truemplemann, V.
    Kratz, R.D.
    1600, (26):
  • [7] Design and construction of a 'pointed' arch bridge
    Vitiello, E.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2007, 160 (04) : 181 - 184
  • [8] The longest-span stone arch bridge in the world
    Liu, Shilin
    Hu, Chongwu
    Zhang, Jian'gong
    Zhou, Wei
    ISISS 2005: Innovation & Sustainability of Structures, Vol 1-3, 2005, : 1253 - 1259
  • [9] THE LONGEST-SPAN STONE ARCH BRIDGE IN THE WORLD
    Liu, Shilin
    SUSTAINABLE ARCH BRIDGES, 2011, 2011, : 219 - 224
  • [10] Construction Simulation of Long-Span Arch Rib Bridge
    Tian, Weifeng
    Zhou, Shuixing
    Zhang, Liangliang
    Saeed, Ayad Thabit
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 871 - +