International comparison of requirements for connection of wind turbines to power systems

被引:131
作者
Jauch, C
Matevosyan, J
Ackermann, T
Bolik, S
机构
[1] Riso Natl Lab, Wind Energy Dept, DK-4000 Roskilde, Denmark
[2] Royal Inst Technol, Dept Elect Engn, SE-10044 Stockholm, Sweden
[3] Vestas Wind Syst AS, R&D Dept, DK-6950 Ringkobing, Denmark
关键词
wind power production; grid code; connection requirements; fault ride-through; transient fault; wind turbine;
D O I
10.1002/we.160
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Power production from wind turbines has increased considerably during the lost decade. Therefore today's wind turbines, which are typically set up in wind farms, have a significant influence on the operation of power systems. The efficient and secure operation of power systems is supported by grid codes, which are sets of requirements for all network users (suppliers, customers, etc.). In Europe, several transmission network operators have introduced special grid connection requirements for wind farms. These requirements are mainly based on existing grid codes, initially written for conventional power plants usually equipped with synchronous generators. This article presents a comparison of grid connection requirements for wind farms issued, or proposed as a draft, by transmission network operators in Denmark, Sweden, Germany, Scotland and Ireland Copyright (c) 2005 John Wiley & Sons, Ltd.
引用
收藏
页码:295 / 306
页数:12
相关论文
共 14 条
[1]  
Akhmatov V., 2002, Wind Engineering, V26, P171, DOI 10.1260/030952402762056081
[2]  
Akhmatov V., 2000, Proceedings of the IASTED International Conference Power and Energy Systems, P235
[3]   Modelling and transient stability of large wind farms [J].
Akhmatov, V ;
Knudsen, H ;
Nielsen, AH ;
Pedersen, JK ;
Poulsen, NK .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2003, 25 (02) :123-144
[4]  
AKHMATOV V, 2002, WORKSH TRANSM NETW O, P23
[5]  
[Anonymous], 2001, WIND ENERGY
[6]  
Bolik S. M., 2003, P 4 INT WORKSH LARG
[7]  
Christiansen P., 2003, P 4 INT WORKSH LARG
[8]  
*ELTR, 2002, SPEC CONN WIND FARMS
[9]  
Hansen Martin O.L., 1998, BASIC ROTOR AERODYNA
[10]  
Jörss W, 2003, DECENTRALISED POWER GENERATION IN THE LIBERALISED EU ENERGY MARKETS, P1