Determining the bounds of skilful forecast range for probabilistic prediction of system-wide wind power generation

被引:11
|
作者
Cannon, Dirk [1 ]
Brayshaw, David [1 ,2 ]
Methven, John [1 ]
Drew, Daniel [1 ]
机构
[1] Univ Reading, Dept Meteorol, Reading, Berks, England
[2] Univ Reading, Natl Ctr Atmospher Sci, Reading, Berks, England
关键词
Wind Power Forecasting; Global NWP; Ensemble Forecasting; Predictability; Ramping; Skill Scores; ENSEMBLE PREDICTION; GREAT-BRITAIN; REAL;
D O I
10.1127/metz/2016/0751
中图分类号
P4 [大气科学(气象学)];
学科分类号
0706 ; 070601 ;
摘要
State-of-the-art wind power forecasts beyond a few hours ahead rely on global numerical weather prediction models to forecast the future large-scale atmospheric state. Often they provide initial and boundary conditions for nested high resolution simulations. In this paper, both upper and lower bounds on forecast range are identified within which global ensemble forecasts provide skilful information for system-wide wind power applications. An upper bound on forecast range is associated with the limit of predictability, beyond which forecasts have no more skill than predictions based on climatological statistics. A lower bound is defined at the lead time beyond which the resolved uncertainty associated with estimating the future large-scale atmospheric state is larger than the unresolved uncertainty associated with estimating the system-wide wind power response to a given large-scale state. The bounds of skilful ensemble forecast range are quantified for three leading global forecast systems. The power system of Great Britain (GB) is used as an example because independent verifying data is available from National Grid. The upper bound defined by forecasts of GB-total wind power generation at a specific point in time is found to be 6-8 days. The lower bound is found to be 1.4-2.4 days. Both bounds depend on the global forecast system and vary seasonally. In addition, forecasts of the probability of an extreme power ramp event were found to possess a shorter limit of predictability (4.5-5.5 days). The upper bound on this forecast range can only be extended by improving the global forecast system (outside the control of most users) or by changing the metric used in the probability forecast. Improved downscaling and microscale modelling of the wind farm response may act to decrease the lower bound. The potential gain from such improvements have diminishing returns beyond the short-range (out to around 2 days).
引用
收藏
页码:239 / 252
页数:14
相关论文
共 50 条
  • [1] System-Wide Emissions Implications of Increased Wind Power Penetration
    Valentino, Lauren
    Valenzuela, Viviana
    Botterud, Audun
    Zhou, Zhi
    Conzelmann, Guenter
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2012, 46 (07) : 4200 - 4206
  • [2] Probabilistic wind speed forecast for wind power prediction using pseudo ensemble approach
    Al-Yahyai, Sultan
    Gastli, Adel
    Charabi, Yassine
    2012 IEEE INTERNATIONAL CONFERENCE ON POWER AND ENERGY (PECON), 2012, : 127 - 132
  • [3] Probabilistic Forecast of Wind Power Generation With Data Processing and Numerical Weather Predictions
    Wu, Yuan-Kang
    Wu, Yun-Chih
    Hong, Jing-Shan
    Phan, Le Ha
    Quoc Dung Phan
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2021, 57 (01) : 36 - 45
  • [4] Probabilistic Forecast of Wind Power Generation with Data Processing and Numerical Weather Predictions
    Wu, Yuan-Kang
    Wu, Yun-Chih
    Hong, Jing-Shan
    Le Ha Phan
    Dung Phan Quoc
    2020 IEEE/IAS 56TH INDUSTRIAL AND COMMERCIAL POWER SYSTEMS TECHNICAL CONFERENCE (I&CPS), 2020,
  • [5] Probabilistic load margin assessment considering forecast error of wind power generation
    Wang, Chenxu
    Ma, Junchao
    Shen, Yifei
    Peng, Yan
    ENERGY REPORTS, 2023, 9 : 1014 - 1021
  • [6] Power Generation Forecast of Hybrid PV-Wind System
    Sanjari, Mohammad Javad
    Gooi, Hoay Beng
    Nair, Nirmal-Kumar C.
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2020, 11 (02) : 703 - 712
  • [7] An online transfer learning model for wind turbine power prediction based on spatial feature construction and system-wide update
    Liu, Ling
    Wang, Jujie
    Li, Jianping
    Wei, Lu
    APPLIED ENERGY, 2023, 340
  • [8] Generation Scheduling for Wind Power Generation by Storage Battery System and Meteorological Forecast
    Tanabe, T.
    Sato, T.
    Tanikawa, R.
    Aoki, I.
    Funabashi, T.
    Yokoyama, R.
    2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 5477 - +
  • [9] Power System Operation by Prediction Interval of Photovoltaic Generation Forecast
    Masuta, Taisuke
    Fonseca, Joao Gari da Silva, Jr.
    Oozeki, Takashi
    Murata, Akinobu
    2015 IEEE 10TH INTERNATIONAL CONFERENCE ON INDUSTRIAL AND INFORMATION SYSTEMS (ICIIS), 2015, : 349 - 353
  • [10] Study on forecast of time series of wind velocity for wind power generation by using wide meteorological data
    Taniguchi, Kengo
    Ichiyanagi, Katsuhiro
    Yukita, Kazuto
    Goto, Yasuyuki
    IEEJ Transactions on Power and Energy, 2008, 128 (02) : 416 - 422