A general treatment of uncertainties in batch process planning

被引:10
|
作者
Lee, YG [1 ]
Malone, MF [1 ]
机构
[1] Univ Massachusetts, Dept Chem Engn, Amherst, MA 01003 USA
关键词
D O I
10.1021/ie9907122
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
A general strategy for treating uncertainties in batch process scheduling was described by Lee and Malone (Int. J. Prod. Res. 2001, in print). The strategy is based on hybridization of the Monte Carlo simulation and simulated annealing techniques. In this paper, the same strategy was used to develop a flexible planning algorithm that handles the open-shop model of batch plant operation and the discrete demand pattern. Using the flexible planning algorithm, we can estimate the maximum capacity of a batch plant and make a capacity plan in the face of uncertainties in product demands and due dates. After the capacity planning, we obtain a flexible plan that maximizes the expected profit and has some free time as a source of future flexibility. An example solved with this flexible planning algorithm shows that it is possible to use only half of the maximum capacity of a batch process because of uncertainty. This means that, in order to reduce the future inventory costs, we should not plan to run a batch process at its maximum production capacity when uncertainty is involved. The lower apparent utilization of the flexible plan will reduce the impact of uncertainties in the future.
引用
收藏
页码:1507 / 1515
页数:9
相关论文
共 50 条
  • [1] BATCH PROCESS PLANNING
    RIPPIN, DWT
    CHEMICAL ENGINEERING, 1991, 98 (05) : 100 - 107
  • [2] Flexible batch process planning
    Lee, YG
    Malone, MF
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2000, 39 (06) : 2045 - 2055
  • [3] Batch process planning for waste minimization
    Lee, YG
    Malone, MF
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2000, 39 (06) : 2035 - 2044
  • [4] A new approach to batch process planning
    Lee, YG
    Malone, MF
    THIRD INTERNATIONAL CONFERENCE ON FOUNDATIONS OF COMPUTER-AIDED PROCESS OPERATIONS, 1998, 94 (320): : 146 - 151
  • [5] Incorporating organ movements in IMRT treatment planning for prostate cancer: Minimizing uncertainties in the inverse planning process
    Unkelbach, J
    Oelfke, U
    MEDICAL PHYSICS, 2005, 32 (08) : 2471 - 2483
  • [6] Geometrical uncertainties and proton treatment planning
    Schwarz, M.
    RADIOTHERAPY AND ONCOLOGY, 2014, 111 : S79 - S79
  • [7] Viscosity model uncertainties in an ash stabilization batch mixing process
    Svantesson, T
    Lauber, A
    Olsson, G
    IMTC/2000: PROCEEDINGS OF THE 17TH IEEE INSTRUMENTATION AND MEASUREMENT TECHNOLOGY CONFERENCE: SMART CONNECTIVITY: INTEGRATING MEASUREMENT AND CONTROL, 2000, : 909 - 914
  • [8] A PROCESS PLANNING SYSTEM FOR SMALL BATCH FORGING
    UDOVITSKII, GP
    SOKOLOV, LN
    SOVIET ENGINEERING RESEARCH, 1981, 1 (07): : 50 - 52
  • [9] Overview of planning and scheduling of batch process operations
    Giritligil, S
    Cesur, S
    Kuryel, B
    DYNAMICS & CONTROL OF PROCESS SYSTEMS 1998, VOLUMES 1 AND 2, 1999, : 455 - 460
  • [10] IGRT and treatment planning: Geometric uncertainties and individualized patient treatment
    Balter, I.
    Ten Haken, R.
    Lam, K.
    MEDICAL PHYSICS, 2007, 34 (06) : 2534 - 2534