Best practices for integrating the concurrent engineering environment into multipartner project management

被引:18
|
作者
Karlsson, Mary [2 ,3 ]
Lakka, Antti [4 ,5 ]
Sulankivi, Kristiina [6 ]
Hanna, Awad S. [1 ]
Thompson, Benjamin P. [1 ]
机构
[1] Univ Wisconsin, Dept Civil & Environm Engn, Madison, WI 53706 USA
[2] SRF Consulting Grp Inc, Minneapolis, MN 55447 USA
[3] Univ Wisconsin Madison, Madison, WI USA
[4] Rakennuostoimisto Palmberg Oy, Tampere, Finland
[5] VTT Bldg & Transport, Madison, WI USA
[6] VTT Tech Res Ctr Finland, FIN-33101 Tampere, Finland
关键词
D O I
10.1061/(ASCE)0733-9364(2008)134:4(289)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The use of the Internet, e-mail, and other technologies has been steadily filtering into the building process, creating a concurrent engineering (CE) environment, and enabling collaborative efforts in the building process. The concurrent engineering environment is established by a variety of tools, including internet accessible servers, e-mail, mobile telephones, and many other existing CE tools. Organizations involved in the construction process recognize the need for assessment of benefits resulting from CE tools, but find the evaluation of these benefits difficult and complicated. The project presented in this paper, "project management and organization in the concurrent engineering environment (ProCE)," is applicable to both researchers and practitioners. The ProCE project developed a measuring model, which may be used by future researchers in this area, attempted to measure benefits derived from using the CE environment in construction design and project management routines, and developed guidelines for best practice implementation by practitioners, based on four case studies. The project included the measurement of both the quantitative and qualitative benefit of CE environment implementation in building construction projects using tools that were readily available through application service providers. Measurement of cost and other quantifiable benefits have been extensively studied. Therefore, the majority of the discussion in the current paper will address the ProCE project's measurement of qualitative benefits.
引用
收藏
页码:289 / 299
页数:11
相关论文
共 50 条
  • [1] Project management in the concurrent engineering environment
    Sulankivi, Kristiina
    Lakka, Antti
    Luedke, Mary
    VTT Publications, 2002, (470): : 3 - 100
  • [2] Project management in the concurrent engineering environment
    Sulankivi, Kristiina
    Lakka, Antti
    Luedke, Mary
    VTT Publications, 2002, (469): : 3 - 162
  • [3] INTEGRATING EVERYTHING: Project Management Tools, Tips, and Best Practices
    Hanson, Jenny
    Isicson, Robin
    Computers in Libraries, 2024, 44 (03) : 23 - 26
  • [4] Concurrent project management and engineering departments
    Charue-Duboc, F
    Midler, C
    SOCIOLOGIE DU TRAVAIL, 2002, 44 (03) : 401 - 417
  • [5] Integrating concurrent engineering concepts in a steelwork construction project
    Anumba, CJ
    Baldwin, AN
    Bouchlaghem, D
    Prasad, B
    Cutting-Decelle, AF
    Dufau, J
    Mommessin, M
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2000, 8 (03): : 199 - 212
  • [6] PRACTICES PROJECT MANAGEMENT STRATEGIES IN OUTSOURCING BEST PRACTICES
    Hassan, Mohd Ghozali
    Ojeniyi, Adegoke
    Razalli, Mohd Rizal
    JURNAL TEKNOLOGI, 2015, 77 (05): : 35 - 41
  • [7] Best management practices for integrating refugee employees
    Adamovic, Mladen
    Cooney-O'Donoghue, Diarmuid
    HUMAN RESOURCE MANAGEMENT JOURNAL, 2025, 35 (01) : 91 - 115
  • [8] Methodology for integrating Concurrent Engineering concepts in a steelwork construction project
    Anumba, CJ
    Baldwin, AN
    Bouchlaghem, D
    Prasad, B
    Cutting-Decelle, AF
    Dufau, J
    Mommessin, M
    ADVANCES IN CONCURRENT ENGINEERING: CE99, 1999, 99 : 479 - 488
  • [9] Multi project management (MPM) at engineering & construction companies - Best practices of project division's total project operations
    Tanaka, Hiroshi
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 678 - 684
  • [10] Project management system for a concurrent engineering framework
    Dey, PK
    HYDROCARBON PROCESSING, 2001, 80 (04): : 71 - +