Prediction model with optimal matching parameters for a dynamic track stabiliser during railway maintenance

被引:2
|
作者
Yan, Bo [1 ]
Hu, Bin [2 ]
Huang, Yayu [3 ]
机构
[1] Kunming Univ Sci & Technol, Fac Art & Commun, Kunming 650500, Peoples R China
[2] China Railway Construct Heavy Ind Co Ltd, Changsha 410100, Peoples R China
[3] Kunming Univ Sci & Technol, Fac Mech & Elect Engn, Kunming 650500, Peoples R China
基金
中国国家自然科学基金;
关键词
dynamic track stabiliser; the sleeper lateral resistance; operation parameters; optimal matching; prediction model; ballast state correction coefficient; railway maintenance; the optimum quality state of ballast bed; fitting analysis; INDUCED GROUND VIBRATION; BALLAST; RESISTANCE;
D O I
10.1504/IJMIC.2019.107485
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Nowadays, high-speed and heavy duty trains make ballasted track extremely busy, and thus it is necessary to solve the conflict between the traffic density and the maintenance work load. However, since the mechanical properties of discrete ballast bed are complex, there is a lack of in-depth investigation into the working performance of large-scale railroad maintenance machinery. In this paper, we take the WD-320 dynamic track stabiliser as the research object, to study the effect of operation parameters on the quality state of the ballast bed. Based on the field test data, a prediction model for optimal matching of operation parameters has been constructed, which can be used to estimate, compare and determine the optimal operation parameter combination for the operation process. By operating according to the optimal operation parameter combination, the optimum quality state of the ballast bed can be quickly reached, to solve the conflict between the traffic density and the necessary maintenance window.
引用
收藏
页码:369 / 377
页数:9
相关论文
共 50 条
  • [1] Optimal Scheduling of Track Maintenance on a Railway Network
    Zhang, Tao
    Andrews, John
    Wang, Rui
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2013, 29 (02) : 285 - 297
  • [2] An adaptive opportunistic maintenance model based on railway track condition prediction
    Letot, Christophe
    Soleimanmeigouni, Iman
    Ahmadi, Alireza
    Dehomhreux, Pierre
    IFAC PAPERSONLINE, 2016, 49 (28): : 120 - 125
  • [3] A stochastic railway track maintenance model
    Prescott, D. R.
    Andrews, J. D.
    De Rozieres, F.
    SAFETY, RELIABILITY AND RISK ANALYSIS: BEYOND THE HORIZON, 2014, : 873 - 879
  • [4] Optimal scheduling of track maintenance activities for railway networks
    Su, Zhou
    De Schutter, Bart
    IFAC PAPERSONLINE, 2018, 51 (09): : 386 - 391
  • [5] Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule
    Tatsuo Oyama
    Masashi Miwa
    Japan Journal of Industrial and Applied Mathematics, 2006, 23
  • [6] Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule
    Oyama, Tatsuo
    Miwa, Masashi
    JAPAN JOURNAL OF INDUSTRIAL AND APPLIED MATHEMATICS, 2006, 23 (02) : 207 - 224
  • [7] Predictive railway maintenance based on statistical analysis of track geometric parameters
    Insa, R.
    Salvador, P.
    Inarejos, J.
    Civil-Comp Proceedings, 2012, 98
  • [8] Railway Track Geometry Degradation Modelling and Prediction for Maintenance Decision Support
    Rebello, Sinda
    Cholette, Michael E.
    Huy Truong-Ba
    Reddy, Venkat
    Rosser, Alan
    Watkin, Tina
    15TH WCEAM PROCEEDINGS, 2022, : 422 - 432
  • [9] All-integer type linear programming model analyses for the optimal railway track maintenance scheduling
    Masashi Miwa
    Tatsuo Oyama
    OPSEARCH, 2004, 41 (3) : 155 - 164
  • [10] Network-Level Railway Track Maintenance Management Model
    Burrow, M. P. N.
    Naito, S.
    Evdorides, H. T.
    TRANSPORTATION RESEARCH RECORD, 2009, (2117) : 66 - 76