Comparative analysis of the performance of a novel U-shaped 'chasing-overtaking' production line

被引:5
|
作者
Chen, Qin [1 ]
Liao, ShiLong [2 ]
Wu, ZhongZhen [3 ]
Yi, ShuPing [4 ]
机构
[1] Lanzhou Inst Technol, Coll Mat Engn, Lanzhou, Peoples R China
[2] Lanzhou Univ Technol, Sch Econ & Management, Lanzhou, Peoples R China
[3] Northwest Univ Nationalities, Coll Math & Comp Sci, Lanzhou, Peoples R China
[4] Chongqing Univ, Coll Mech Engn, Chongqing 630044, Peoples R China
基金
中国国家自然科学基金;
关键词
U-shaped; production line design; chasing-overtaking; work sharing; bucket brigades; travelling; BUCKET BRIGADES; ALLOCATION; SIMULATION; SYSTEMS; MODEL; WORK;
D O I
10.1080/00207543.2015.1125033
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Fluctuations in market demands, increased mobility of workers and changing employment practices as well as companies' increased respect for individual differences of workers have led to the phenomenon that workers with large efficiency differences work together in the same production line in manufacturing companies. In a traditional travelling production line (TrPL), low-efficiency workers can block the work of higher efficiency workers. To increase the production capacity of a travelling line composed of workers with different efficiencies, a chasing-overtaking mechanism was established and used to achieve line production capacity and efficiency improvement. A formula to calculate the production capacity of two workers with different efficiencies was derived and validated. A simulation performed to analyse the differences between the 'chasing-overtaking' production line (COPL), TrPL and the classic 'bucket brigade' production line (BBPL) with respect to production capacity, working time utilisation and equipment utilisation demonstrated that the COPL provides good production capacity and adaptability to worker differences. Finally, the statistical analysis verified that the COPL has a higher production capacity, average worker working hour utilisation rate and equipment utilisation rate than the BBPL and TrPL.
引用
收藏
页码:3677 / 3690
页数:14
相关论文
共 50 条
  • [1] Analysis and optimization of a U-shaped production line
    Ohno, K
    Nakade, K
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1997, 40 (01) : 90 - 104
  • [2] Self-Organizing Chasing-Overtaking Production Lines to Maximize Worker Capabilities
    Liao, ShiLong
    Xie, XiaoQing
    Chen, Qin
    Li, JingJing
    Wang, ZongGuang
    IFAC PAPERSONLINE, 2019, 52 (13): : 2752 - 2757
  • [3] Stochastic analysis of a U-shaped production line with multiple workers
    Nakade, K
    Ohno, K
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 809 - 812
  • [4] Reversibility and dependence in a U-shaped production line
    Nakade, K
    Ohno, K
    QUEUEING SYSTEMS, 1995, 21 (1-2) : 183 - 197
  • [5] Optimum efficiency of U-shaped flexible production line
    Lin, Fang
    Zheng, Shixiong
    2006 9TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION, VOLS 1- 5, 2006, : 789 - +
  • [6] Optimal allocation of heterogeneous workers in a U-shaped production line
    Nakade, Koichi
    Nishiwaki, Rei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (03) : 432 - 440
  • [7] Bounds and approximations for cycle times of a U-shaped production line
    Nakade, K
    Ohno, K
    Shanthikumar, JG
    OPERATIONS RESEARCH LETTERS, 1997, 21 (04) : 191 - 200
  • [8] An optimal worker allocation problem for a U-shaped production line
    Nakade, K
    Ohno, K
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 60-1 : 353 - 358
  • [9] Simulation-based Assembly Line Balancing in U-shaped, Parallel U-shaped, and Parallel Adjacent U-shaped Layouts
    Doung, P.
    Sirovetnukul, R.
    Ren, J.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 751 - 755
  • [10] PERIODICITY OF CYCLE TIME IN A U-SHAPED PRODUCTION LINE WITH HETEROGENEOUS WORKERS
    Hiraiwa, Mikihiko
    Nakade, Koichi
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2099 - 2103