Static behavior of grouped large headed stud-UHPC shear connectors in composite structures

被引:124
|
作者
Wang, Jingquan [1 ]
Xu, Qizhi [1 ]
Yao, Yiming [1 ]
Qi, Jianan [1 ]
Xiu, Hongliang [1 ]
机构
[1] Southeast Univ, Sch Civil Engn, Key Lab Concrete & Prestressed Concrete Struct, Minist Educ, Nanjing 210096, Jiangsu, Peoples R China
关键词
Large headed stud; Grouped stud; Ultra-high performance concrete (UHPC); Push-out test; Precast; Accelerate bridge construction (ABC); HIGH-PERFORMANCE CONCRETE; REINFORCED CEMENTITIOUS COMPOSITES; PUSH-OUT TESTS; STRENGTH CONCRETE; FIBER; BEAMS;
D O I
10.1016/j.compstruct.2018.08.038
中图分类号
O3 [力学];
学科分类号
08 ; 0801 ;
摘要
Accelerated bridge construction (ABC) utilizing precast systems offers many benefits such as faster onsite construction and lower traffic impacts. Ultra-high performance concrete (UHPC) becomes an innovative solution that facilitates some types of ABC. This paper proposes a novel steel-UHPC composite system and large studs with diameter of 30 mm. Push-out tests are conducted to investigate the shear behavior of large studs embedded in UHPC and compared with normal strength concrete (NSC). A total of 6 single stud and 18 grouped studs specimens are used to investigate the effects of casting method, precast deck strength, infilling material strength and transverse reinforcement in the shear pocket. Test results showed that grouped stud effect in the UHPC specimen was insignificant. Ultimate strength of grouped stud in precast UHPC deck was 10% higher than that of NSC precast slab while interfacial slip of UHPC specimen was 17% lower. Noting that grouped large studs better match with UHPC since no visible crack was observed at failure in UHPC slab while NSC slab displayed a number of cracks. Finally, load-slip relationship for large grouped studs embedded in UHPC was proposed based on experimental results and comparisons between the test results of strength and codes predictions were made.
引用
收藏
页码:202 / 214
页数:13
相关论文
共 50 条
  • [1] Static behavior of large stud shear connectors in steel-UHPC composite structures
    Wang, Jingquan
    Qi, Jianan
    Tong, Teng
    Xu, Qizhi
    Xiu, Hongliang
    ENGINEERING STRUCTURES, 2019, 178 : 534 - 542
  • [2] Static behavior of grouped stud shear connectors in steel-precast UHPC composite structures containing thin full-depth slabs
    Fang, Zhuangcheng
    Fang, Haozhen
    Huang, Junxing
    Jiang, Haibo
    Chen, Gongfa
    ENGINEERING STRUCTURES, 2022, 252
  • [3] Behavior of headed stud shear connectors in composite beam
    Lam, D
    El-Lobody, E
    JOURNAL OF STRUCTURAL ENGINEERING, 2005, 131 (01) : 96 - 107
  • [4] Static behavior of large stud shear connectors
    Shim, CS
    Lee, PG
    Yoon, TY
    ENGINEERING STRUCTURES, 2004, 26 (12) : 1853 - 1860
  • [5] Experimental studies of headed stud shear connectors in UHPC Steel composite slabs
    Gao, Xiao-Long
    Wang, Jun-Yan
    Yan, Jia-Bao
    STRUCTURAL ENGINEERING AND MECHANICS, 2020, 74 (05) : 657 - 670
  • [6] Static behavior of stud shear connectors with initial damage in steel-UHPC composite bridges
    Qi, Jianan
    Tang, Yiqun
    Cheng, Zhao
    Xu, Rui
    Wang, Jingquan
    ADVANCES IN CONCRETE CONSTRUCTION, 2020, 9 (04) : 413 - 421
  • [7] Static behavior of stud shear connectors in high-strength-steel-UHPC composite beams
    Tong, Lewei
    Chen, Luhua
    Wen, Ming
    Xu, Chen
    ENGINEERING STRUCTURES, 2020, 218 (218)
  • [8] Experimental investigation on static mechanical performance of grouped-stud shear connectors in steel-UHPC composite beams
    Chai, Wenhao
    Di, Jin
    Lu, Youfu
    Qin, Fengjiang
    Men, Pengfei
    Su, Yi
    ENGINEERING STRUCTURES, 2024, 306
  • [9] Push-out tests of demountable headed stud shear connectors in steel-UHPC composite structures
    Wang, Jun-Yan
    Guo, Jun-Yuan
    Jia, Liang-Jiu
    Chen, Shi-Ming
    Dong, Yang
    COMPOSITE STRUCTURES, 2017, 170 : 69 - 79
  • [10] Cyclic behavior of rubber-coated stud-UHPC shear connectors exposed to reversed cyclic loadings
    Wang, Shaodi
    Li, Yuanhai
    Wang, Ruipeng
    Ma, Yuhong
    Zhao, Guifeng
    Zhang, Tianjun
    Guo, Dawen
    ENGINEERING STRUCTURES, 2024, 314