Numerical Simulation of the Cooling Water System of a 115 MW Hydro-Power Plant

被引:5
|
作者
Georgescu, Sanda-Carmen [1 ]
Georgescu, Andrei-Mugur [2 ]
Jumara, Alexandru [1 ]
Piraianu, Vlad-Florin [1 ]
Dunca, Georgiana [1 ]
机构
[1] Univ Politehn Bucuresti, Power Engn Fac, 313 Spl Independentei, Bucharest 060042, Romania
[2] Tech Univ Civil Engn Bucharest, Hydraul & Environm Prot Dept, 124 Lacul Tei, Bucharest 020396, Romania
来源
关键词
Cooling water; throttle control valve; hydropower unit; step-up transformer; EPANET; Hydro-Power Plant; MODEL;
D O I
10.1016/j.egypro.2015.12.230
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The present case study points on the cooling water system of the Hydro-Power Plant (HPP) Bradisor, on the Lotru River in Romania. This 115 MW underground power plant is equipped with two Francis turbines. We built in EPANET a numerical model to simulate the operation of the cooling water system of this HPP, for different working scenarios. The whole hydraulic system is a complex one: it is composed of a main cooling water network fed by pumps, a water-based fire fighting network for the hydropower generators and a backup cooling water network fed from the penstock pipes. The numerical model of the whole cooling water system consists of 87 pipes, 133 junctions, 6 variable speed driven centrifugal pumps, 59 valves and 3 reservoirs. Some throttle control valves (TCV) are artificially inserted in our numerical model and are set with appropriate loss coefficients values to be equivalent to the equipments that introduce minor losses in the system and don't exist as physical components in EPANET. Those equipments are: air-water heat exchangers (placed around the hydropower generators), oil-water heat exchangers (of heavy-duty thrust bearings, of turbines' and generators' guide bearings, of the 130 MVA step-up transformer), coolers of turbines' seals and self-cleaning filters (one for each hydropower unit and another one for the transformer). The loss coefficient for each equivalent TCV was set based on pressure loss values measured in situ on each equipment. The numerical results (pressure and flow rate values) match the existing recordings. The simulations prove that by using a proper calibration of the numerical model, EPANET capabilities can be extended for more complex systems than the water distribution systems. (C) 2016 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:228 / 234
页数:7
相关论文
共 50 条
  • [1] Assessing the Operation of the Cooling Water System of a Hydro-Power Plant Using EPANET
    Bucur, Diana Maria
    Cosoiu, Costin Ioan
    Iovanel, Raluca Gabriela
    Nicolae, Alina Alexandrina
    Georgescu, Sanda-Carmen
    SUSTAINABLE SOLUTIONS FOR ENERGY AND ENVIRONMENT, EENVIRO 2016, 2017, 112 : 51 - 57
  • [2] Numerical Simulation of Cooling Water of Yangluo Power Plant
    Qu, Wenqian
    Zhang, Xiaofeng
    Lu, Xinhua
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 2043 - 2046
  • [3] An intelligent multimedia training system for hydro-power plant operators
    Pu, Y
    Luo, YL
    Zhang, JH
    Liu, LG
    Yu, XZ
    Yang, TC
    POWERCON '98: 1998 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY - PROCEEDINGS, VOLS 1 AND 2, 1998, : 1003 - 1006
  • [4] Numerical simulation of catastrophic flood: the case study of hypothetical failure of the Bielkowo hydro-power plant reservoir
    Szydlowski, Michal
    Szpakowski, Wojciech
    Zima, Piotr
    ACTA GEOPHYSICA, 2013, 61 (05) : 1229 - 1245
  • [5] Numerical simulation of catastrophic flood: the case study of hypothetical failure of the Bielkowo hydro-power plant reservoir
    Michał Szydłowski
    Wojciech Szpakowski
    Piotr Zima
    Acta Geophysica, 2013, 61 : 1229 - 1245
  • [6] Planning a small hydro-power plant in Lubeck (Germany) - Who owns the water?
    Oertel, M.
    SUSTAINABLE HYDRAULICS IN THE ERA OF GLOBAL CHANGE: ADVANCES IN WATER ENGINEERING AND RESEARCH, 2016, : 221 - 226
  • [7] Sliding Mode/H∞ Control of a Hydro-power Plant
    Ding, Xibei
    Sinha, Alok
    2011 AMERICAN CONTROL CONFERENCE, 2011, : 5201 - 5206
  • [8] Multiaxial fatigue analysis for the shaft of a 100 MW hydro-power generator
    Mantilla, C. A.
    Valdes, J. A.
    Casanova, F.
    JOURNAL OF MECHANICAL ENGINEERING AND SCIENCES, 2019, 13 (02) : 4928 - 4945
  • [9] Hydro energy potential of cooling water at the thermal power plant
    Stevanovic, Vladimir D.
    Gajic, Aleksandar
    Savic, Ljubodrag
    Kuzmanovic, Vladan
    Arnautovic, Dusan
    Dasic, Tina
    Maslovaric, Blazenka
    Prica, Sanja
    Milovanovic, Bojan
    APPLIED ENERGY, 2011, 88 (11) : 4005 - 4013
  • [10] Modeling and control of a small hydro-power plant for a DC microgrid
    Gil-Gonzalez, Walter
    Danilo Montoya, Oscar
    Garces, Alejandro
    ELECTRIC POWER SYSTEMS RESEARCH, 2020, 180